Laserfiche WebLink
Mar. 2b. 2013 10:36AM Donlee Pump Co. No, 2172 P. 5 <br />Monitoring System Certification <br />UST Monitoring Site Plan <br />`. .................... <br />.......... 111::: <br />....................................... ............... <br />::::::::::::::::::::::: ...............'":: � ........ <br />...................................................... <br />.......... ......... <br />............................. <br />.............................................. <br />.............. <br />.......... <br />.............................................................. <br />.................................................. <br />:::::::::::::........... ; . �i . . . . . . . . . . . <br />...........1:111:111......... :::::' : ::: ...... <br />Date map was drawn: _3 /(^!t� . <br />Instructions <br />If you already have a diagram that shows all required information, you may include it, rather than this page, with your Monitoring <br />System Certification. On your site plea, show the general layout of tanks and piping. Clearly identify locations of the following <br />equipment, if installed: monitoring system control panels; sensors monitoring tank annular spaces, sumps, dispenser pans, spill <br />containers, or other secondary containment areas; mechanical or electronic line leak detectors; and in -tank liquid level probes (if used <br />for leak detection). In the space provided, note the date this Site Plan was prepared. <br />Page 4 of 4 <br />ETN -W — b/6 www.unidomorg Rev. 01/17M <br />