Laserfiche WebLink
SECONDARY PIPE TESTING <br />Test Method Developed By: ❑ Piping Manufacturer ® Industry Standard ❑ Professional Engineer <br />❑ Other (Specify) <br />Test Method Used: ® Pressure ❑ Vacuum ❑ Hydrostatic <br />❑ Other (Specify) <br />Test Equipment Used: Pressure Guage Equipment Resolution: 0 Change in <br />Product Line to <br />nsition <br />F <br />91 Product Line to <br />dispensers <br />Red Diesel <br />Product Line to <br />transition <br />Red Diesel Product <br />Line to dispensers <br />Piping Material: <br />Fiberglass <br />Fiberglass <br />Fiberglass <br />Fiberglass <br />Piping Manufacturer: <br />Unknown <br />Unknown <br />Unknown <br />Unknown <br />Piping Diameter: <br />2 inches <br />2 inches <br />2 inches <br />2 inches <br />Length of Piping Run: <br />70 Feet <br />15 Feet <br />70 Feet <br />15 Feet <br />Product Stored: <br />91 octane <br />91 octane <br />Red Diesel <br />Red Diesel <br />Method and location of <br />piping -run isolation: <br />Reducer Boot with <br />Schrader Valve in <br />transition Sump <br />Sealed off Reducer <br />Boot after pipe <br />daylights <br />Reducer Boot with <br />Schrader Valve in <br />transition Sump <br />Sealed off Reducer <br />Boot after pipe <br />daylights <br />Wait time between <br />applying <br />pressure/vacuum/water <br />and starting test: <br />10 minutes <br />10 minutes <br />10 minutes <br />10 minutes <br />Test Start Time: <br />10:35 <br />10:35 <br />10:35 <br />10:35 <br />Initial Reading (R,): <br />5.0 psi <br />5.0 psi <br />5.0 psi <br />5.0 psi <br />Test End Time: <br />11:35 <br />11:35 <br />11:35 <br />11:35 <br />Final Reading (RF): <br />5.0 psi <br />5.0 psi <br />5.0 psi <br />5.0 psi <br />Test Duration: <br />1 hour <br />1 hour <br />1 hour <br />1 hour <br />Change in Reading (RF -R,): <br />0 psi <br />0 psi <br />0 psi <br />0 psi <br />Pass/Fail Threshold or <br />Criteria: <br />0 psi change <br />0 psi change <br />0 psi change <br />0 psi change <br />Test Result: <br />® Pass ❑ Fail <br />Z Pass C 7 Fail <br />Z Pass Fail <br />0 Pass 0 Fail <br />Comments — (include information on repairs made prior to testing, and recommended follow-up for failed <br />tests) <br />