Laserfiche WebLink
AIItechPei'i'B- ' <br />Compliance without Compromise Village West Marina <br />Annular sensor <br />(C1) <br />Vapor <br />Fill <br />12,000 Gallon <br />Premium <br />Gasoline tank <br />Turbine and <br />Piping Sump <br />Fuel Dock (L-2) <br />Turbine and <br />Piping Sump 2,000 Gallon <br />(L-1) Diesel tank <br />Fill <br />Annular <br />(C2) <br />Diesel <br />Dispenser <br />Gas <br />Dispenser <br />Fuel Kiosk on Pier. <br />Veeder-Root console <br />is mounted here. <br />Piping sump. Here is where the <br />piping makes the transition <br />from underground to <br />Gas aboveground. Liquid sensor #3 <br />Dispenser is in here. <br />© Alltech 2012 <br />P.O. Box 4208, Sonora, CA 95370 <br />Phone: 209-532-7320; Fax: 209-533-2650; mail@alltechpetro.com <br />California Tank Tester: 09-1749; California Contractor 623541 A-Haz <br />