My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
1901
>
3500 - Local Oversight Program
>
PR0544688
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/24/2019 9:39:44 AM
Creation date
7/24/2019 9:31:26 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0544688
PE
3526
FACILITY_ID
FA0001946
FACILITY_NAME
El Dorado Food Mart
STREET_NUMBER
1901
Direction
S
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95206
APN
16508019
CURRENT_STATUS
02
SITE_LOCATION
1901 S EL DORADO ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
211
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
A Page 1 of I <br /> Frank Girard ! [EH] <br /> c <br /> From : Ally Colavita [acolavita@advgeoenv.com] <br /> Sent: Friday, May 28, 2010 8: 14 AM <br /> I To: Frank Girardi [EH] ; Nuel Henderson [EH] <br /> Cc: wlittle@advgeoenv.com <br /> Subject: QNS#1 , 1901 S. EI Dorado St. , Stockton <br /> c <br /> Frank & Nuel— <br /> The Interim Remedial Action Plan (] RAP) for QNS# 1 , 1901 S . EI Dorado Street, Stockton , proposing <br /> Dual Phase Extraction (DPE), was uploaded to GeoTracker on 5/26/10 under the confirmation number <br /> 6751969337. The ] RAP proposes a very aggressive schedule for the installation and operation of the <br /> DPE system at the site. The RP, Mohammad Matar, is having financial difficulties and is in need of <br /> refinancing his station , which cannot happen until he is in remediation . Below is the proposed schedule <br /> presented in the TRAP: <br /> • Early July: Apply for a SJVAPCD ATC permit. Submittal of PG&E new service application and <br /> USTCF reimbursement request for DPE remediation system ; <br /> • Mid July 2010 : Installation of DPE remedial wells EW-1 and EW-2; <br /> • Late July 2010: Installation of remedial piping (including trenching , backfilling and resurfacing) <br /> and dedicated sewer discharge line; and <br /> • Late August 2010 : Installation of electrical service at the site for dedicated PG&E meter. <br /> We realize you have several other sites/reports/ work plans to review, but anything you could do to help <br /> us to adhere to the above schedule and help Mr. Matar would be appreciated . If you have any <br /> questions , or concerns, please do not hesitate to contact me . Have a nice weekend . <br /> Ally Colavita <br /> Project Scientist <br /> Advanced GeoEnviron mental, Inc. <br /> Stockton • Santa Rosa • Monterey • Brea • Spokane • Reno <br /> 800 -511 -9300 <br /> acolavita(aadvgeoenv . com <br /> www.advgeoenv.com <br /> This email/fax message is for the sole use of the intended recipient(s) and may contain confidential and <br /> privileged information . Any unauthorized review, use, disclosure or distribution of this emaiUfax is <br /> prohibited. if you are not the intended recipient, please contact the sender by emaiUfax and destroy all <br /> paper and electronic copies of the original message. <br /> 5/28/2010 <br />
The URL can be used to link to this page
Your browser does not support the video tag.