My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
1901
>
3500 - Local Oversight Program
>
PR0544688
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/24/2019 9:39:44 AM
Creation date
7/24/2019 9:31:26 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0544688
PE
3526
FACILITY_ID
FA0001946
FACILITY_NAME
El Dorado Food Mart
STREET_NUMBER
1901
Direction
S
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95206
APN
16508019
CURRENT_STATUS
02
SITE_LOCATION
1901 S EL DORADO ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
211
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ban doacnjuin Comfy <br /> o P.4utN. C Enw, ff"© Pf11�it� c� fr tW �� eaKh Department <br /> Donna REHS <br /> 600 East Main Street <br /> Stockton , CaUfarnia 95202 =3029 PROGRAM COORDINATORS <br /> , .. Robert McClellon, REHS <br /> Jeff Carruesco, REHS, RDI <br /> c . . , . 'P <br /> ��� Website: WWW.5J�OV. OYQ/6'I76' Kasey Foley, REHS <br /> F o. <br /> Phone: (209) 4683420 <br /> 6 ax: May) 11 2010 <br /> Mohammad S . & Wafa Matar Nasheem Khan <br /> 1901 S . EI Dorado Street 5925 Terminal Apt. 1 <br /> Stockton, CA 95206 Riverbank, CA 95367 <br /> Subject: Quick & Save <br /> 1901 South EI Dorado <br /> Stockton , CA 95206 <br /> The San Joaquin County Environmental Health Department (EHD) has reviewed Dual <br /> Phase Extraction Pilot Test Report — November 2009 (Report), dated March 4, 2009 , <br /> prepared by Advanced GeoEnvironmental , Inc. (AGE). <br /> In the WP, AGE recommends preparation of an interim remedial action work plan <br /> proposing dual-phase extraction (DPE) as the remediation technology to be used at the <br /> site to mitigate petroleum hydrocarbon-impacted soil and groundwater. The EHD <br /> approves AGE's recommendation and directs that a work plan be submitted to the EHD <br /> by July 12, 2010 . <br /> If you have any questions , please contact Frank Girardi at (209) 953-7868. <br /> 4vlvas <br /> Frank Girardi , REHS Nuel C . Henderson , Jr. , PG <br /> Senior Registered Environmental Health Specialist Engineering Geologist <br /> c: James Barton , RWQCB, 11020 Sun Center Dr. , #200, Rancho Cordova , CA 95670 <br /> c: Ally Colavita , Project Scientist, AGE, 837 Shaw Road , Stockton, CA 95215 <br />
The URL can be used to link to this page
Your browser does not support the video tag.