My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
1901
>
3500 - Local Oversight Program
>
PR0544688
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/24/2019 9:39:44 AM
Creation date
7/24/2019 9:31:26 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0544688
PE
3526
FACILITY_ID
FA0001946
FACILITY_NAME
El Dorado Food Mart
STREET_NUMBER
1901
Direction
S
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95206
APN
16508019
CURRENT_STATUS
02
SITE_LOCATION
1901 S EL DORADO ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
211
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
j . <br /> M Mohammed Matar, Assignee -2- 11 /3/09 <br /> COST PRE-APPROVAL BREAKDOWN <br /> # Task* Amount Pre- Comments <br /> Approved <br /> 1 Planning / Coordination $ 17310 no changes to proposal . <br /> 2 DPE Pilot Test $227930 no changes to proposal . <br /> 3 Report Preparation $2 , 915 no changes to proposal . <br /> TOTAL PRE-APPROVED $27, 155 <br /> * Task descriptions are the same as those identified in Advanced GeoEnvironmental , <br /> Inc. 's September 18 , 2009 , cost estimate. <br /> • Only the tasks/costs reflected on the above table are pre-approved at this time . The <br /> Fund will review any tasks/costs that go beyond the pre-approved amount to be <br /> determined if the additional tasks and costs are necessary and reasonable . <br /> However, if costs exceed the above pre-approved amounts , the Fund will be unable <br /> to expedite your Reimbursement Request . <br /> • The work products must be acceptable to the County and the Regional Water <br /> Quality Control Board . <br /> • If a different scope of work becomes necessary, then you must request pre-approval <br /> of costs on the new scope of work. <br /> • Although I have referred to the Advanced GeoEnvironmental , Inc. proposal in my <br /> pre-approval above , please be aware that you will be entering into a private contract; <br /> the State of California cannot compel you to sign any specific contract. This letter <br /> pre-approves the costs as presented in the proposal dated September 18 , 2009 , <br /> by Advanced GeoEnvironmental , Inc . for conducting the work approved by the <br /> County for implementing the October 6 , 2008 , Advanced GeoEnvironmental , Inc . <br /> work plan . <br /> I also want to remind you that the Fund 's regulations require that you obtain at least <br /> three bids , or a bid waiver from Fund staff, from qualified firms for all necessary future <br /> corrective action work . If you need assistance in procuring contractor and consultant <br /> services , don 't hesitate to call me . <br /> California EnWronmenta/ Protection Agency <br /> Zb*Recpded paper <br />
The URL can be used to link to this page
Your browser does not support the video tag.