My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
1901
>
3500 - Local Oversight Program
>
PR0544688
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/24/2019 9:39:44 AM
Creation date
7/24/2019 9:31:26 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0544688
PE
3526
FACILITY_ID
FA0001946
FACILITY_NAME
El Dorado Food Mart
STREET_NUMBER
1901
Direction
S
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95206
APN
16508019
CURRENT_STATUS
02
SITE_LOCATION
1901 S EL DORADO ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
211
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
QUICK-N-SAVE # 1 page % e1 <br /> r <br /> r <br /> Path to Closure Plan :M GEOTRACKER HOME MANAGE PROJECTG I REPORTS SEARCH I LOGOUT <br /> QUICK.N-SAVE #1 (T0607700903) - MAP THIS SITE OPEN - REMEDIATION <br /> 1901 IES <br /> STOCK ON , CA 95206 ACTIVITIES CLEANUP OVERSIGHT ACTIVITIES REPORT SAN JOAQUIN COUNTY ALOP (LEAD) - CASEA 599 <br /> SAN JOAN , CA 95206 CASENORKER: VICKI MCCARTNEY - SUPERVISOR: AORIENNEELLSAESSER <br /> SAN JOAQUIN COUNTY PUBLIC WEEPAGE CENTRAL VALLEY RWQCB (REGION 5S) - CASE#. 391088 <br /> VIEW PRINTABLE CASE SUMMARY FOR THIS SIM CASEWORKER: JAMES BAR TON - SUP SO CONDON <br /> CUP Claim Y: 14848 OF Priority Assigned; BCUP Amount Paid; Sj T@�3 <br /> THIS PROJECT WAS LAST MODIFIED BY NUEL HENDERSON ON 12/11 nO134:08:29 PM .12§IOBY <br /> THIS SITE HAS SUBMITTALS. CLICK HH_ TO OPEN A NEW WINDOW WITH THE SUBMITTAL APPROVAL PAGE FOR THIS SITE. <br /> Path to Closure Plan THIS VERSION IS FINAL AS OF 1Y1112813 PATH TO CLOSURE KISTO CLEAR I RESET PAW TO CLOSURE PLAIN <br /> IMPEDIMENT I : <br /> General Criteria E: A conceptual site model that assesses the nature, extent, and mobility of the release R Procedural Impediment - INFO <br /> has NOT been developed Inadequate Funding <br /> DATE RESOLVED <br /> Step to Resolve Impediment 1 - Step 1: - DELETE STEP <br /> COMPLETION DATE <br /> pare ana submit work plan to complete the tlo -g tlrent assessment OE impacted groundwater <br /> PROJECTEDDATETE <br /> ACTUALDA <br /> 913012014 F� � <br /> Step to Resolve Impediment 1 - Step 2: - DELETE STEP <br /> tluct fieldwork to collect data needed to complete down-gradient assessment of impacted groundwater <br /> COMPLETION DALE <br /> PROJECTED DATE <br /> ACTUALDAIE <br /> 12312014 F�� <br /> Step to Resolve Impediment I Step DELETE STEP coMPLETION DAIS <br /> rt <br /> port of findings and updated CSM. ALTUAL <br /> PROJECTED <br /> 3131/2015DATE <br /> FID <br /> ADDADDMONAI. STEP <br /> IMPEDIMENT 2: <br /> General Criteria F: Secondary source has NOT been removed to the extent practicable ❑ Procedural Impediment -INFO <br /> Shp to Resolve Impediment 2 - Step 1: - DELETE STEP <br /> COMPLETON DATE <br /> Third quarter o em benzene ions errs, <br /> wart r 2013 run f OPE system has reduced be ze a concentrat' below LTCB criteria; <br /> resuscitation system mass recovery rate is less than 1 pound per day, cease CeE operation. i PROJECTED DAM ACTUAL GATE <br /> 123112014 <br /> Step to Resolve Impediment 2 - Step 2: - DELETE STEP <br /> COMPLETION DATE <br /> nduct rebound testing or benzene and MME . PROJECTED DATE ACTUALDATE <br /> co rn f <br /> _. 9/30/2015 <br /> _ . . . . _ . . _. __._ _._ _._.___ ____ . _ _. I <br /> ADOADDITIONALSTE <br /> REQUIREMENTS ALONG PATH TO CLOSURE <br /> DATEIDENTIFIED RPNOTIFICATION PUBLIC PARTICIPATION WELL DESTRUCTION WASTEDISPOSAL LAND USE <br /> FOR CLOSURE• CLOSURE INITIATED BY DATE COMPLETION DATE DATEM DATE RESTRICHON DATE SITE CLOSURE DATE <br /> Date Identified for Closure Is the dale all impediments to closure have been removed <br /> Save Form as PariallyCompleted Save FFotm as Complete <br /> LOGGED IN AS HENDERSONN CONTACT GEOTRACKER HELP <br /> https ://geotracker.waterboards.ca.gov/regulators/screens/closure_policy.asp?global_id=T. . . 12/ 11 /2013 <br />
The URL can be used to link to this page
Your browser does not support the video tag.