My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
2057
>
3500 - Local Oversight Program
>
PR0544689
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/24/2019 9:51:23 AM
Creation date
7/24/2019 9:45:24 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0544689
PE
3526
FACILITY_ID
FA0003735
FACILITY_NAME
QUICK N EASY MART
STREET_NUMBER
2057
Direction
S
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95206
APN
16515309
CURRENT_STATUS
02
SITE_LOCATION
2057 S EL DORADO ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
133
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
QUICK-N-SAVE#2 ♦•r, Page l of 1 <br /> Path to Closure Plan GO GEOTR19!E HOMEIMAti PROJECTSJREPORTSISEARCHILOGOUT <br /> QUICK-N-SAVE#2(70607700901)-MAP THIS SITE CWEN-REMEDIATION <br /> 2057 EL DORADO ST CLEANUP OVERSIGHT AGENCIES <br /> STOCKTON,CA 95206 ACTIVITIES REPORT SAN JOAQUIN COUNTY LOP(LEAD)-CASE#:000696 <br /> CASEWORKER:ANGELICA SANDOVAL MARIN-SUPERVISOR:ADRIENNE ELLSAESSER <br /> SAN JOAQUIN COUNTY PUBLIC WEBPAGE CENTRAL VALLEY RWQCB(REGION 5S)-CASE#391086 <br /> VIEW PRINTABLE CASE e-,)MMARY FOR THIS SITE CASEWORKER:JAMES BARM-SUPERVISOR:CORI CONDON <br /> CUF Claim#:15567 CUF Priority Assigned:B CUF Amount Paid:5448.238 <br /> THIS PROJECT WAS LAST MODIFIED BY NOEL HENDERSON ON 12/11/2013 4:25:27 PM-HISTORY <br /> THIS SITE HAS SUBMITTALS.CLICK HFRF TO OPEN A NEW WINDOW WITH THE SUBMITTAL APPROVAL PAGE FOR THIS SITE. <br /> Path to Closure Plan THIS VERSION IS FINAL AS OF 1211112013 PATH TO CLOSURE HISTORY CLEAR I RESET PATH TO CLOSURE PLAN <br /> IMPEDIMENT 1: <br /> General Criteria E:A conceptual site model that assesses the nature,extent,and mobility of the release F Procedural Impediment-INFo <br /> has NOT been developed <br /> Step to Resolve Impediment 1-Step 1:- <br /> COMPLETION DATE <br /> .omplete a CSM or submit a report identifying previous reports that contain the core elements of a CSM. <br /> ?,corporate recent soil and groundwater data collected in 2013. PROJECTED DATE ACTUAL DATE <br /> 6130/2014 <br /> ADD ADDITIONAL STEP <br /> IMPEDIMENT 2: <br /> General Criteria F:Secondary source has NOT been removed to the extent practicable Procedural Impediment-AEP l <br /> Step to Resolve Impediment 2-Step 1:-DELETE STEP <br /> COMPLETION DATE <br /> Implement approved GWE COC, in groundwater. <br /> PROJECTED DATE ACTUAL DATE <br /> 9/30/2014 F- <br /> Stop to Resolve Impediment 2-Step 2:-DELETE STEP <br /> COMPLETION DATE <br /> Continue remediation to practicable extent. <br /> PROJECTED DATE ACTUAL DATE <br /> 9/30/2015 �— <br /> ADD ADDITIONAL STEP <br /> IMPEDIMENT 3: <br /> Media-Specific Criteria:Groundwater:The contaminant plume that exceeds water quality objectives is r7 Procedural Impediment-INFO <br /> NOT stable or decreasing in areal extent,and does NOT meet all of the additional characteristics of one of <br /> the five classes of sites. <br /> Conditions that do not meet the policy criteria: <br /> • Plume Length(That Exceeds Water Quality Objectives):Unknown <br /> • Plume is Stable or Decreasing in AREAL Extent:Unknown <br /> • Benzene Concentration:z 3,000 pg11 <br /> • MTBE Concentration:>_1,000 pg1I <br /> • Nearest Supply Well(From Plume Boundary):Unknown <br /> • Nearest Surface Water Body(From Plume Boundary):>250 Feet and<_1,000 Feet <br /> Step to Resolve Impediment 3-Step 1:-DELETE STEP <br /> COMPLETION DATE <br /> Implement approved GWE work plan to red_ice CoC, in grcundwater. <br /> PROJECTED DATE ACTUAL DATE <br /> 9/30/2014 F <br /> Step to Resolve Impediment 3-Step 2:-DELETE STEP COMPLETION DATE <br /> 77;777— to practicable extent. <br /> PROJECTED DATE ACTUAL DATE <br /> 9/30/2015 F <br /> ADD ADDITIONAL STEP <br /> REQUIREMENTS ALONG PATH TO CLOSURE <br /> PUBLIC WELL <br /> DATE IDENTIFIED RP NOTIFICATION PARTICIPATION DESTRUCTION WASTE DISPOSAL LAND USE SITE CLOSURE <br /> FOR CLOSURECLOSURE INITIATED BY DATE COMPLETION DATE DATE DATE (RESTRICTION DATE DATE <br /> SAN JOAQUIN COUNTY LOP F I <br /> ;'Date Identified for Closure Is the date all Impediments to closure have been removed <br /> Save Form as Partially com: eteTd save Form as complete <br /> LOGGED IN AS HENDERSONN CONTACT GEOTRACKER HELP <br /> https:Hgeotracker.waterboards.ca.gov/regulators/screens/closure_policy.asp?global_id=T... 12/11/2013 <br />
The URL can be used to link to this page
Your browser does not support the video tag.