Laserfiche WebLink
ISite Background Information Quick N Save #1 <br /> Page 3 of 3 <br /> I <br /> and 1,420mg/kg of benzene, toluene, ethylbenzene, and xylenes, respectively in boring B 1-3 5' <br /> MONITORING WELL INSTALLATION <br /> On 17 and 18 March 2004, four soil borings (MW1 through MW4) were advanced at the site A <br /> CME-75HT truck mounted drill ng was utilizing to advance 8 25-inch diameter hollow-stem augers <br /> to the total depth of each boring The dnll ng and three-man crew were supplied by Cascade Drilling <br /> Incorporated of Rancho Cordova,California Soil samples were collected ahead of the drill bit using <br /> a California modified split-spoon sampler loaded with three pre-cleaned 2-inch by 6-inch brass <br /> sleeves The samples were collected from the pilot borings at 5-foot intervals, beginning at <br /> 10 feet bsg, using a 140-pound hammer to advance the sampler <br /> Generally, an orange-brown, dry, clayey silt (fill matenal),was encountered from surface grade to <br /> approximately 6 feet bsg Orange brown to brown, dry, silts and clayey silts were encountered from <br /> approximately 6 feet bsg to 26 feet bsg Orange brown to blue grey hydrocarbon stained, slightly <br /> moist, clay was encountered from approximately 26 feet to 36 feet bsg in MW1, MW2 and MW3 <br /> and from 20 to 24 feet bsg in the area of MW4 Gray hydrocarbon stained, moist to saturated silty <br /> • sand was encountered from approximately 36 feet bsg to 53 feet bsg Saturated soil was encountered <br /> at 40 feet bsg Blue, hydrocarbon-stained clay was encountered from approximately 53 feet bsg to <br /> 55 feet bsg <br /> IPilot borings MW1 and MW3 were completed as ground water monitoring wells using 2-inch <br /> diameter PVC casing,with 0 020-inch slotted screen installed from approximately 35 to 55 feet bsg, <br /> I MW2 was completed in a similar manner with slotted screen installed from approximately 25 to <br /> 45 feet bsg, and MW4 was installed in a similar manner with slotted screen installed from <br /> approximately 30 to 50 feet bsg <br />' TPH-g was detected in soil samples collected from bonngs MW1 through MW4 at maximum <br /> concentrations in each boring of 1 2 milligrams per kilogram (mg/kg) (MW1-40), 2 9 mg/kg <br />' (MW2-45), 5 7 mg/kg(MW3-45)and 2 7 mg/kg(MW4-40),respectively At least one ofthe BTEX <br /> constituents were detected in soil samples collected from borings MW 1 through MW4 at maximum <br /> concentrations of 0 44 mg/kg(benzene),0 072 mg/kg(toluene),0 12 mg/kg(ethylbenzene)and 0 20 <br /> mg/kg(xylenes),respectively MTBE was detected in soil samples collected from bonngs MW2 and <br /> MW4 at a maximum concentration of 0 31 mg/kg in sample MW2-35 by EPA Method 8260 No <br />' additional analytes were detected at or above laboratory detection limits in the samples analyzed <br /> Advanced Geo Envkron mental,Inc <br /> I <br />