My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
2154
>
2900 - Site Mitigation Program
>
PR0541437
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/24/2019 11:15:08 AM
Creation date
7/24/2019 11:10:04 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0541437
PE
2965
FACILITY_ID
FA0023751
FACILITY_NAME
MCBILLIN PROPERTY
STREET_NUMBER
2154
Direction
S
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95206
APN
16705021
CURRENT_STATUS
01
SITE_LOCATION
2154 S EL DORADO ST
P_LOCATION
01
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
102
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
A Meuillin Real Esta`re3Ttvest <br /> Path 10 Closure Plan -;I O CKER HOME I MAKAGE PROTECTS I REPORTS I SEARCH I LQQ= <br /> MCBILLIN REAL ESTATE INVESTMENT (T7 00 0 000 261 5) - MAP THIS SITE OPEN . SITEASSESSMENT <br /> 2154 SOUTH EL DORADO STREET CLEANUP OVERSIGHTAGENCIES <br /> STOCKTON , CA 95206 ACTNITIES REPORT SANJOAOUINCOUNTY LOP (LEAD)- CASE# 1910 <br /> SAN JOAQUIN COUNTY PUBLIC WEBPAGE CASEWORKER: VICKIMCCARTNEY - SUPERVISOR:ADRIENNEELLSAESSER <br /> VIEW PRINTABLE CASE SUMMARY FOR THIS SITE CENTRAL VALLEY RWOCB (REGION 5S) - CME ff. 391164 <br /> CASEWORKER JAMES SARTON - SUPERVISOR: CORI LONDON <br /> CUFCIsmp: l9788, U0120 CUP Priority Assigned: B CUFAmount Paid: 156A13 <br />'.i THIS PROJECTWAS LASTMODIFIEO 8YNUELHENDERS0ON &19.201410:1805AM -hn Ry <br /> THIS SITE HAS SUBMITTALS. CLICK HERE TO OPEN A NEW WNDOW WITH THE SUBMITTALAPPROVAL PAGE FORTHIS SITE. <br />:j <br /> 4 Path to Closure Plan THIS WRSIONISFINALAS OFWW2014 PATH TO CLOSURE HISTORY Ci,FAR I RESET PATH TO CLOSURE PLAN <br /> jl IMPEDIMENT 1 : <br /> General Criteria E: A conceptual site model that assesses the nature, extent, and. mobility of the release r Procedural Impediment - trio <br /> has NOT been developed. <br /> i <br /> Stop to Resolve Impediment I - Sta1: -DELETE STEP <br /> Prepare a work plan to install monitoring w assessment andff <br /> COMPLETION GATE <br /> e and submit a w is ells. to - <br /> a[ of MW-4 south and west o£ M - NEW and vest of - tl tam and east of 184-3 ED DATE ACTU/LLOmP 9ea N 5, N !44 2, an ATE2014 F <br /> Rep to Resolve Impediment l - Std STEP <br /> COMPLETION DATE <br /> tall approved monitoring ells . <br /> PROJECTED GATE D <br /> ns rn w <br /> fi13W2D15 l <br /> Ste to Resolve impediment l - Ste 3: - S <br /> nauct sufficient monitoring characterizeplume. <br /> COMPLETION DATE <br /> PR TE PROJECTED DAACTUAL DATE <br /> 12/302015 <br /> Step to Resolve Impediment i - Ste 4: -DELETE STEP <br /> Prepare and submit an ted conceptual site model. COMPLETION DATE <br /> p p ROJECTED DATE A TUM DATE <br /> - - - - 3130I20IS <br /> ADD ADDITIONAL STEP <br /> IMPEDIMENT 2: <br /> General Criteria F: Secondary source has NOT been removed to the extent practicable r Procedural Impediment - I_ <br /> Ste Resolveimpedimentt Step teaSTEP <br /> COMPLETION DAT <br /> If conceptual site model demonstrates rasa need for remediation, prepare interim corrective action plan. <br /> PROJE <br /> ODA ACTUAL DATE <br /> 12/302014 <br /> Step to Passive Impandinuent 2 - Ste 2: -PJLKMSM <br /> Complete a thirty-day public participation period . COMPLETION DATE <br /> PROJECTED DA rACTUAL DATE <br /> te— <br /> 2152015 l i <br /> Step to Resolve Impediment 2 - Ste 3: - <br /> Implementpilot study, f need r co action plan or remedial acts plan. <br /> COMPLETION GATE <br /> PROJECTED <br /> DJECTED DATE CTUAL DATE <br /> 121J02015 �� <br /> ADD ADDFUONALSTEP <br /> IMPEDIMENT 3: <br /> Media-Specific Criteria: Groundwater: The contaminant plume that exceeds water quality objectives is ❑ Procedural Impediment -Ihism <br /> NOT stable or decreasing in areal extent, and does NOT meet all of the additional characteristics of one of <br /> the five classes of sites. <br /> Conditions that do not meet the policy criteria: <br /> • Plume Length (That Exceeds Water Quality Objectives): Unknown <br /> • Plume is Stable or Decreasing in AREAL Extent: Unknown <br /> • Free Product in Groundwater: No <br /> • Benzene Concentration: 23,000 pg/1 <br /> • Nearest Supply Well (From Plume Boundary): Unknown <br /> Step to Resolve Impediment 3 - Ste 1 : -D s <br /> COMPLETION DATE <br /> repare a wells groundwater assessment south and <br />' SStNNW andrwestns£wMw-2 , to <br /> NNEeantl9east ofPROJECTED <br /> st of MW-9 , south and west of M - MW-3 . 14 TE <br /> Step to Resolve Impediment 3 - Ste 2: - DELETE STEP <br /> COMPLETION DATE <br /> D DA E <br /> Complete a sensitive receptor Suri y 1Yd02014 ACTUAL <br /> Step to ResAve Impediment 3 - Step 3: -DELETE STEP COMPLETION DATE <br /> https://geotracker.waterboards.ca.gov/regulators/screens/closure_policy.asp?global_id=T1 . . - 6/19/2014 <br />
The URL can be used to link to this page
Your browser does not support the video tag.