Laserfiche WebLink
31 August 2012 <br /> AGE Project No . 1 1 - 1 847 <br /> Page 8 of 9 <br /> conducting grouting procedures. <br /> 3 .4 . WELL DEVELOPMENT AND SURVEY <br /> Development will consist of a combination of bailing to remove the major portion of fine- <br /> grained sediment from inside the well , surging to flush out or draw in sediment from the <br /> filter pack, and additional bailing to finish the removal of sediment. Development activities <br /> will be continued until field parameter (pH , electrical conductivity, and temperature) <br /> readings have stabilized . Additionally, each well head elevation and GPS location <br /> coordinate will be surveyed by a licensed surveyor. <br /> 3 .5 . GROUNDWATER SAMPLING PROCEDURES <br /> Groundwater sample collection will be performed in accordance with the CVRWQCB <br /> guidelines and sampling protocols (Tri-Regional Water Quality Control Board <br /> Recommendations for Preliminary Investigations and Evaluation of Underground Storage <br /> Tanks) . <br /> 3 . 5 . 1 . Static Water Level Measurements <br /> Before purging and sampling during ground water monitoring events , static water level will <br /> be measured using a Solist water level meter. Water level data will be recorded to the <br /> nearest 0. 01 -foot from a reference point marked of the top of the PVC well casing . Before <br /> and after each use , the electric water level indicator will be washed in an Alconox solution <br /> and rinsed with water. <br /> 3. 5 .2 . Well Evacuation <br /> Subsequent to measurement of depth to water and prior to sampling , wells will be purged <br /> using a using a disposable polyethylene bailer or dedicated Teflon tubing used in <br /> conjunction with a Waterra inertial pump . To ensure ground water samples are <br /> representative of the formation , rather than water standing in the well casing , wells will be <br /> purged until : 1 ) a minimum of three casing volumes is removed from the well ; and/or 2) the <br /> field-measured ground water parameters pH , temperature and electrical conductivity have <br /> stabilized . However, if a well is purged dry prior to evacuating three casing volumes , a <br /> ground water sample will be collected following 80 percent recovery of ground water level <br /> within the well or within 8-hours of well evacuation . <br /> Advanced GeoEnvironmental, Inc. <br />