Laserfiche WebLink
08/24/2000 16:35 2095385 GEOLOGICAL TECH[ PAGE 09 j <br /> GeoCngua(Technirs 4nc. Wage 6 <br /> Valentine(Castle Motors) <br /> Vertical Def.WP <br /> August 23,2000 <br /> 3.0 SCHEDULE & REPORTING <br /> Geological Technics Inc. anticipates beginning fieldwork no later than 30 days after work <br /> plan approval, cost pre approval from the Fund and upon issuance of the drilling permit. The <br /> information gathered during this phase of work will be presented in a report that will include <br /> a summary of the geology as well as the results of sample analyses. Dr. Ray Kablanow, a <br /> Registered Geologist and Certified Hydrogeologist, will supervise the project. Copies of the <br /> report will be forwarded to both the appropriate County and State regulatory agencies <br /> (SCDER and CRWQCB). <br /> I <br /> 4.0 SIGNATURE AND CERTIFICATION <br /> This project will be perfon-ned by Geological Technics Inc. in accordance with accepted <br /> geologic and hydrologic standards of the State of California accepted and in effect at the time <br /> of this investigation. Geological Technics Inc. is not responsible for undisclosed conditions. <br /> This work plan was prepared by: <br /> i <br /> Joseph D. Angulo <br /> Geologist <br /> �o <br /> IRU KAKA O*" c� <br /> . � NO-5234 <br /> Raynold I. Kablanow II,Ph.D. <br /> California Registered Geologist#5234 U <br /> Certified Hydrogeologist#442 <br /> I <br />