Laserfiche WebLink
GeologicalTecknics_Inc.- 3 Page 3 <br /> Response to May 17,2000 Letter from SJC PHS/EHD <br /> .'_-`"Project No.723.2 <br /> June 1,2000 <br /> i <br /> • Please schedule a meeting to discuss the status of the site and corrective action <br /> requirements with Mr. Valentine and GTI. Mr. Noah Heller and UST Cleanup Fund <br /> representatives will be contacted and requested to attend the meeting. <br /> I <br /> Rationale: Senate Bill No. 665, effective January 1, 2000, requires the local agency to <br /> advise and work with the responsible party to seek cost pre-approval of corrective <br /> action costs[California Health and Safety Code, Section 25299. 37 (c)(6)(A)]. <br /> i <br /> • Please state in writing that PHS/EHD is requiring CPT with Simul-Probe type <br /> technology rather than making a recommendation for its use. <br /> Rationale: This distinction is necessary in order to facilitate cost reimbursement from <br /> the UST Cleanup Fund. If CPT with Simul-Probe technology is attempted and proves <br /> unsuccessful, then the UST Cleanup Fund could make a determination that the costs <br /> were unreasonable due to a foreseeable lack of success and thus requiring additional <br /> mobilizations to the site. <br /> If you have any questions, please call me at(209) 538-6424. <br /> Respectfully Submitted, <br /> CGeol"ogicafTechinics Inc. j <br /> Joseph D. Angulo <br /> Geologist <br /> cc: Steve Valentine` -- <br /> Mark List- CRWQCB <br /> Ms. Linda Sanborn—USTCFP <br /> Mr. Allen Patton-USTCFP <br /> ! <br />