My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE FILE 1
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
2315
>
2900 - Site Mitigation Program
>
PR0544690
>
SITE INFORMATION AND CORRESPONDENCE FILE 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/24/2019 11:47:13 AM
Creation date
7/24/2019 11:27:34 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
FileName_PostFix
FILE 1
RECORD_ID
PR0544690
PE
3528
FACILITY_ID
FA0005839
FACILITY_NAME
CASTLE AUTOMOTIVE REPAIR INC.
STREET_NUMBER
2315
Direction
N
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95204
APN
12510017
CURRENT_STATUS
02
SITE_LOCATION
2315 N EL DORADO ST
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
254
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
11/141ZOOi 15:4! 2694683433 FIFTH FLOOR PAGE 02 <br /> ENv�ONW <br /> _ NTAL HEALTH DEPARTMENT <br /> Pqu!N - <br /> °'� SAN JOAQUIN COUNTY <br /> Donna K.Herman,R.E.K...S. <br /> pest Supervisors <br /> Director 304 East Weber Avenue;Third Floor Carl Roroman,R.E.H.s. <br /> AI Olsen,R.lf.xs. Stockton, Cali.forn.ia 95202-2705 Niilte Huggins,R.E.H.S,,R.D.I. <br /> o9�iKORa�� Program Manager Telephone: 209 Douglas W.Wilson,R.E.H.S. <br /> Laurie A.COWIN,R,E.H.S. p ( �46$-3420 Margaret Lagorio,R.E.H.S. <br /> Prog—1 Manager Fax: (209)464-0138 Robert McClellon,R.&.I.1.S, <br /> Mark Rarcellos,R.E.H.S. <br /> STEPHEN VALENTINE <br /> STEVE & GENES SERVICE <br /> 5232 HEMET AVE <br /> STOCKTON CA 95207 <br /> RE: STEVE 8c GENES SERVICES SITE CODE:2080 <br /> 2315 N EL DORADO ST <br /> STOcxTON CA 95204 <br /> WORKPLAN.- EfWbAb 51.,16 Fork Plan IDs1a1 Phare Sort Iln nrand 6,yurdWa'rt?-E.X/1-a6ti0n Pilot Test <br /> DATED- .9 tember 8. 2003 �"— <br /> PREPARED BY: Geoloe cal Technics It,c (GM <br /> APPROVED with Conditions (See Below) <br /> ADEQUATE AND NECESSARY ELEMENTS OF THE WORKPLAN(H&S <br /> 25299.37,subd.(c)(3).): <br /> 1. Install one 4-inch dual-phase extraction well(EW-1)and two 4-inch soil vapor <br /> monitoring/extraction wells nW 1,VEW-4 to evaluate the parameters needed its <br /> designing a dual-phase soil vapor extraction and groundwater extraction remediation system_ <br /> 2. Conduct a 5-day pilot test using the proposed extraction well consisting of a soil vapor <br /> extraction test and a groundwater extraction test. <br /> 3. Collect soil vapor and groundwater sarnples dtuing the pilot test for laboratory analyses. <br /> 4. Prepare a report of findings including calculation of the 'radius of influence of the soil vapor <br /> extraction test and the effect of the groundwater.pump test. <br /> COMMENTS AND CONDMONS: <br /> 1. Modify the screen section of the proposed EW-1 from 20 feet below surface grade(bsg) to <br /> GO feet bsg,to 20 feet bsg to 55 feet bsg. Kevin.Graves of the State Water Resources <br /> Control Board(SWRCB)has expressed concerns of potential vertical flow(ambient flow)of <br /> groundwater and cross-contamination of aquifers its,long wen screens,and requested <br /> ambient flow be measured in was-With screen section over 20 feet below groundwater. The <br /> last depth to groundwutcr level at the site was measured at approximately 36 feet bsg, <br /> (September 2003). Reducing the sercet length of F-W 1 to less than 20 feet of screen below <br /> groundwater eliminates the need of measuring ambient flow in the well <br /> 2. Install the wells by}December 17,2003. However,if possible EHD recommends that the <br /> wells be installed in the same mobility as the installation of the monitoring wells(Oct,2002 <br /> work plan by GTI) during the 3rd week of November,2003 to maximize cost-effectiveness. <br /> DATED Noveanber 15 2003 By <br /> Cc- CRWQCB,Central Valley Region=James L.L. Barton,RG <br /> Ce: Geological Tedmics,Inc.-Raynold 1,Kablanow <br />
The URL can be used to link to this page
Your browser does not support the video tag.