My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS FILE 2
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
2315
>
2900 - Site Mitigation Program
>
PR0544690
>
WORK PLANS FILE 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/24/2019 11:41:49 AM
Creation date
7/24/2019 11:34:09 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
FileName_PostFix
FILE 2
RECORD_ID
PR0544690
PE
3528
FACILITY_ID
FA0005839
FACILITY_NAME
CASTLE AUTOMOTIVE REPAIR INC.
STREET_NUMBER
2315
Direction
N
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95204
APN
12510017
CURRENT_STATUS
02
SITE_LOCATION
2315 N EL DORADO ST
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
117
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r-, <br /> i <br /> Croultd Zero Awlysis, lAe. <br /> 1172 Kansas Avenue <br /> Modesto,California 95351 <br /> (209)522-4119/Fax(209)522-4227 <br /> April 30, 2013 <br /> Project No. 723.2 <br /> Project Name: Valentine(El Dorado) <br /> Mr. Stephen Valentine <br /> 201 Marc Ave <br /> Stockton, CA 95207 <br /> Re: Work Plan: Well Destruction Addendum <br /> Location: 2315 N. El,Dorado Street, Stockton, CA i <br /> Dear Mr. Valentine: <br /> As requested in a December 5, 2012 email from Mr. Harlin Knoll of San Joaquin County <br /> Environmental Health Department (SJCEHD), Geological Technics Inc. prepared and <br /> f submitted a work plan for destruction of the monitoring wells at the site as noted above. <br /> Following the review of the work plan, a SJCEHD email dated April 17, 2013 requested that <br /> an addendum be prepared which describes the methods for destroying the CMT multi- <br /> chamber monitoring wells. <br /> Ground 'Zero Analysis, Inc. (GZA) has prepared the following work plan addendum <br /> describing the methods that will be used in the destruction of the CMT wells. <br /> CMT Well Abandonment <br /> Due to conflicting recommendations on the destruction of CMT wells by SJCEHD, drillers <br /> and the manufacturer of the CMT multi-chamber monitoring wells, two (2) methods of CMT <br /> well destruction wilt be discussed below. <br /> GZA recommends that pressure grouting be the initial method of well'destruction for CMT <br /> wells MW-7, MW-8, and MW-9. MW-7 and MW-8 have both reported residual <br /> concentrations of contaminants of concern and MW-9 has historically been non-detect or <br /> slightly above detection limits for a few constituents prior to 2008. A complete drill out of <br /> the well will be used as a secondary method of well destruction if pressure grouting is <br /> unsuccessful'. <br /> I <br /> I <br /> l <br /> R <br />
The URL can be used to link to this page
Your browser does not support the video tag.