Laserfiche WebLink
U <br /> Geological Technics Inc. Page 4 <br /> Additional Site Characterization Work Plan <br /> Project No.723.2 <br /> December 10,2007 <br /> 2.1.3 Soil Sample Analyses <br /> The soil samples will be submitted to a State certified laboratory for the following analysis: <br /> • Benzene,toluene, ethyl benzene and xylene(BTEX)by EPA method 8021M or 8260 <br /> • Gasoline range petroleum hydrocarbons(TPH-G)by EPA method 8015M or 8260 <br /> The detection limits for these compounds are listed below. A Chain of Custody will be <br /> completed for all samples collected and tracked to ensure sample integrity. <br /> Detection Limits: BTEX TPH-G <br /> Soil(jig/K 3.0 1,000 <br /> 2.2 Lateral Groundwater Plume Definition <br /> Four well sets consisting of an intermediate and deep well are proposed to define the extent <br /> of the groundwater plume to the northeast and southeast of the site. See Figure 2 for well <br /> locations. Wells MW-110/210, MW-111/211, MW-112/212 and MW 113/213 will be located <br /> approximately 500 feet north, 700 feet northeast, 900 feet east-northeast and 600 feet <br /> southeast of, respectively, the site. The boreholes for the wells in these locations will be <br /> advanced to a total depth of 100 feet bgs. <br /> 2.2.1 Borehole Drilling <br /> The borings will be drilled using an 8-inch outside diameter continuous flight hollow stem <br /> auger. Soil cuttings will be containerized in DOT approved 55-gallon steel drums and held <br /> on site pending disposal. <br /> 2.2.2 Soil Sampling Procedure <br /> The depth/intervals of soil sampling will vary among the proposed well sets: <br /> • Boring MW-210 will be sampled at five foot intervals from the surface to 75 feet bgs to <br /> confirm the lithology identified in!;the CPT-1 borehole location. The borehole will then <br /> be continuously sampled from 75 to 100 feet bgs. The depth of the well MW-210 screen <br /> will be targeted to intercept deeper sand layers that could act as a preferential pathway <br /> for contaminant transport. The MW-110 intermediate well boring will be free drilled to <br /> total depth. The screened interval of this well will be from 65 — 75 feet to intercept sand <br /> units identified in the CPT-1 borehole. If no significant sand layers are encountered <br /> below 75 feet, the screen of well MW-210 will be placed in the same interval as well <br /> MW-308 (89'). <br /> • Boring MW-211 will be sampled at five foot intervals from the surface to 70 feet bgs to <br /> confirm the lithology identified in the CPT-2 borehole location. The borehole will then <br /> be continuously sampled from 70 to 100 feet bgs. The depth of the well MW-211 screen <br /> will be targeted to intercept deeper sand layers that could act as a preferential pathway <br /> for contaminant transport. The MW-111 intermediate well boring will be free drilled to <br /> total depth. The screened interval of this well will also target intermediate sand layers <br />