Laserfiche WebLink
L) <br /> Geological Technics Inc. Page 8 <br /> Additional Site Characterization Work Plan <br /> Project No.723.2 <br /> December 10,2007 <br /> The proposed schedule for the site characterization work is as follows: <br /> Task Description Completion Data <br /> • Submit'additiorial site characterization work plan December 2007 <br /> • Receive approval for the work plan February 2008 <br /> • Prepare budget/USTCFP three bid process March 2008 <br /> • Perform field work May 2008 <br /> • Prepare site characterization report/update site conceptual model July 2008 <br /> 5.0 SIGNATURES & CERTIFICATION <br /> Geological Technics Inc. will perform this project in accordance with accepted geologic and <br /> hydrologic standards of the State of California accepted and in effect at the time of this <br /> investigation. Geological Technics Inc. is not responsible for undisclosed conditions. <br /> This work plan was prepared by:. <br /> Joseph D= Digitally signed by Joseph D Angulo <br /> ON:cn=Joseph D.Angulo <br /> ._US, <br /> o=Geological Technic Inc. <br /> Angulo � Reason:I am the author of this <br /> ..�-•'document <br /> Date:2007.12.12 11:20:46-08'00' <br /> Joseph D. Angulo <br /> Geologist <br /> • <br /> Digitally signed by Raynold 1. •• R.I. I��Matto II <br /> Raynold I. KablanOwll NO.ON:cn=Raynold I.Kablanow II; � � �. <br /> c=U 9.o=Geological Technics Inc. <br /> Ka b l a n owl l l-Reason:l am approving this ! � <br /> document <br /> Date:2007.12.12 11:21:02-08'00' * <br /> 7tYf',9fd113�f14` • <br /> Raynold Kablanow II, Ph.la. * '* <br /> California Professional Geologist#5234 , ' ,'" <br /> Certifiedl�ydrogeoflagist ;442 •;rYcO •0 <br /> � �� •� <br />