Laserfiche WebLink
1 <br /> 1 DEL-TECH Geotechnical Support Services <br /> MONITORING WELL FIELD LOG <br /> PROJECT NAME:Ceske Mold 'SAMPLE ANALYSIS PERFORMED ,,TPM-Gas,B,T,X.E, <br /> 2M N�EI Dorado Strom AMPLE TIME: 16>00 <br />' Sltae[ A SAMPLE CONTAINED($); 3 VO A*s &1 BAILER <br /> BLANK <br /> NALYfitS PERFORMED BY:FOL L 13B <br />' CLIENT HUNTER & ASSOCIATES ATE 10/03/94 <br /> ROJECT MANAGER BILL HUNTER AMPLE LOCATION MW-1 <br />' AMPLER DON LIGHT TART TIME 14 00 <br /> ROUNDWATER XXX 11VADOSE OTHER P I D WELL HEAD READING 718 PPM <br />' CASING ELEVATION (FEET MSL) CASING DIAMETER 2 INCH <br /> DEPTH TO WATER 53 09 FEET CALCULATED PURGE VOLUME 2 7 GAL <br /> EPTH OF WELL 69 80 FEET CTUAL VOLUME PER PURGE 3 0 GAL <br /> TIME VOLUME R14 E.C. TsmpR COLOR OTHER <br /> 1530 0 69 1288 196 TURBID (BRN) HEAVY GAS <br />' ODOR <br /> 04 <br /> 30 70 1344 198 <br /> ' 60 70 1361 199 <br /> 90 70 1358 198 <br /> 1 <br /> ' PURGE METHOD 3 FOOT STAINLESS STEEL BAILER / ELECTRONIC BAILER SPOOL <br /> SAMPLE METHOD 1 FOOT STAINLESS STEEL BAILER <br /> DEPTH TO WATER AFTER PURGE DEPTH TO WATER AT SAMPLE TIME <br /> ' WELL INTEGRITY CAP AND SEAL ARE SECURE, LOCK IS INSTALLED <br /> REMARKS DEVELOPED WELL GOOD RECHARGE <br /> WEATHER. CLEAR SKIES <br /> ' QUALITY CONTROL ALL PURGING EQUIPMENT AND SAMPLING EQUIPMENT WAS CLEANED <br /> IN THE FIELD WITH STEAM CLEANER & ALCONOX <br /> NEW NITRILE GLOVES WERE WORN AT ALL TIMES <br /> ' WELL LOCATION. WEST END OF LOT, NEAR THE FENCE <br /> CONTAINMENT DO T 17 DRUMS <br /> INSTRUMENTATION ORION pH/TEMPERATURE METER 2 POINT pH CALIBRATION (4 0 & 7 0) <br /> ORION CONDUCTIVITY METER <br /> ENVIRONMENTAL INSTRUMENTS SLOPE METER <br /> KECK PRODUCT INTERFACE METER <br /> THERMODYNE 580B PHOTO IONIZATION DETECTOR <br />