My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0008530
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
2315
>
2900 - Site Mitigation Program
>
PR0544690
>
ARCHIVED REPORTS XR0008530
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/24/2019 1:04:19 PM
Creation date
7/24/2019 11:43:53 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0008530
RECORD_ID
PR0544690
PE
3528
FACILITY_ID
FA0005839
FACILITY_NAME
CASTLE AUTOMOTIVE REPAIR INC.
STREET_NUMBER
2315
Direction
N
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95204
APN
12510017
CURRENT_STATUS
02
SITE_LOCATION
2315 N EL DORADO ST
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RE BIDDING AND MINIMUM REQUIREMENTS FOR DEVELOPMENT, <br /> PURGING AND SAMPLING OF MONITORING WELLS <br /> The task-, required for each well are <br /> DEVELOPMENT <br /> 1 ) Suige and pump well construction materials with a surge block and or stainless steel <br /> bailee Remove sufficient amount of material to clear well screen of construction <br /> material and remove all sediments from well casing to create a conduit toe repie,,entative <br /> sampling <br /> Pump or bail a minimum of five volumes from well to complete development <br /> 2 ) Containment of all purge and development water in D O T 17 di ums <br /> 3 ) Sound the well for total depth <br /> 4 ) Cap off and replace monument top <br /> PURGING AND SAMPLING <br /> 1 ) Clean off and open wellhead monument, secure area with appropriate traffic control <br /> 2 ) Initiate a detailed field monitoring log <br /> 3 ) Screen well head annulus for the presence of volatile aromatics with the use of a <br /> calibrated photoionization detector <br /> 4 ) Scan for the presence of free floating product with a product intertace metes <br /> 5 ) Confirm depth to water and overall depth of each well (cal(,ulate Standing water <br /> column) <br /> I <br /> 6 ) Complete a 3-5 well volume purge with a 2" Grundfos stainless steel submersible or a <br /> environmental bladder purge pump <br /> 7 ) Record the Ph, Conductivity, Color and Temperature of each volume to establish and <br /> confirm well development <br /> S ) Contain all purge & decontamination water in D O T 17 steel drums <br /> 9 ) Bail and Sample each well with a teflon, stainless steel or disposable bailei <br /> 10 (A bailer blank will be collected prior to sampling each well) <br />
The URL can be used to link to this page
Your browser does not support the video tag.