My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0008530
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
2315
>
2900 - Site Mitigation Program
>
PR0544690
>
ARCHIVED REPORTS XR0008530
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/24/2019 1:04:19 PM
Creation date
7/24/2019 11:43:53 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0008530
RECORD_ID
PR0544690
PE
3528
FACILITY_ID
FA0005839
FACILITY_NAME
CASTLE AUTOMOTIVE REPAIR INC.
STREET_NUMBER
2315
Direction
N
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95204
APN
12510017
CURRENT_STATUS
02
SITE_LOCATION
2315 N EL DORADO ST
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Wm Hunter, RG, using Spectrum Exploration auger rig & personel <br /> Refer to the above referenced SAR for a detailed description of <br /> that work, The locations of those soil borings are shown on PLATE <br /> IV. Laboratory analyzes from soil samples taken during the <br /> placement of the soil borings revealed that ALL samples were <br /> either below detection limits, or within acceptable levels, for <br /> chlorinated solvents , (EPA 8010 , ) ICAP metals, & TPH-D. BTEX & <br /> TPH-G were below detection limits in all samples except soil <br /> boring #2 at 36' The results of those analyzes are shown on <br /> TABLES Y. VI VI <br /> January, 1994 - A report entitled "PROBLEM ASSESSMENT REPORT <br /> COVERING SOIL CONTAMINATION INVESTIGATION" , was prepared by WJH & <br /> submitted to the San Joaquin County EHD covering the field work <br /> conducted in October, 1993, and discussing the results Refer to <br /> that document for complete details of that work. <br /> F-e-bruary 28 1994 - Correspondence from San Joaquin Co EHD <br /> recommended further assessment and/or re-excavation of the former <br /> waste oil tank site <br /> August 17 , 1224 - WJH prepared a workplan to place one ( 1 ) soil <br /> boring to a depth of 40 ' in the center of the site of the removed <br /> . waste oil tank. <br /> September 3Q, 1994 - One ( 1 ) 2" diameter monitoring well was <br /> placed on the property; details of that work are covered in the <br /> report prepared by WJH titled "Interim Report and Results of <br /> Groundwater Investigation" , dated October 31, 1994 . Laboratory <br /> results revealed the presence of BTEX & TPH-G in both soil & <br /> water samples below 36 ' Refer to TABLES VIII & IX for a summary <br /> of those results. <br /> WORKPLAN FOR PLACING TWO 2" ,DIAMETER SOIL ,BORINGS/ MONITORING <br /> NOTES. ( 1 ) Locations of underground utilities will be identified <br /> prior to beginning the work. <br /> (2) All drilling & completion operations will be done <br /> under the direction of a geologist from Wm J Hunter <br /> & Associates <br /> 1 . Mobilize properly licensed auger rig & support truck equipped <br /> with sufficient clean hollow-stem augers to complete each well <br /> without the necessity of decontaminating equipment The tenta- <br /> tive locations of the two wells are shown on PLATE TV, the final <br /> sites may vary slightly due to interference from underground <br /> utilities or overhead power lines A drilling permit application <br /> will be submitted & approved prior to commencing operations. <br /> Drilling bids are currently being solicited; a contractor has not <br /> 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.