Laserfiche WebLink
• <br /> 9 As soon as practical after development, each well will be <br /> Purged, water levels determined, and water samples taken per <br /> standard WJH field protocol, a copy is attached as EXHIBIT C. <br /> Water depths will be measured in monitoring well #1 during this <br /> work so that accurate gradient determinations can be made. Water <br /> samples may also be obtained from MW-1 if needed <br /> 10 Wellhead elevations & distances between wells will be <br /> determined by a licensed surveyor <br /> Upon completion of the work, a report will be prepared and <br /> submitted to the County EHD for review & comment A copy will <br /> also be furnished to the CRWQCB. <br /> A drilling permit application and required fee will be submitted <br /> as soon as a drilling contractor has been selected Field work <br /> will be scheduled once other needed services have been selected & <br /> permits approved. <br /> Wm9tephen <br /> Hunter & Associates <br /> c Valentine <br /> March 27 , 1995 <br /> V&Lm j HUNTER <br /> /e/17s� <br /> NO 850 <br /> IfsTq�OF CAS-1F���Q <br /> tri <br />