Laserfiche WebLink
1 <br /> 10 <br /> DEL-TECH GEOTECHNICAL SUPPORT SERVICES <br /> IMONITORING WELL FIELD LOG 1999 <br /> IFSA�MPL�ELO�CATIiON 1 MW - 2 DATE: 12/16/99 <br />' PROJECT NAME- CASTLE MOTORS ANALYSIS PERFORMED SEE CHAIN OF CUSTODY <br /> ADDRESS: 2315 N ELDORADO SAMPLE TIME- 1622 <br /> CITY STATE: STOCKTON,CA SAMPLE CONTAINERS: 4 V O A 'S <br /> SITE CONTACT PRESERVATIVES- HCL <br /> CONSULTANT: GEOLOGICAL TECHNICS LAB.ANALYSIS BY: SHERWOOD <br /> PROJECT MANAGER RAY KABLANOW MONUMENT: FLUSH <br /> SAMPLER: DEL-TECH WELL CASING MATERIAL PVC <br /> SIGNED: WELL CASING DIA.: 2" / 01632 <br /> SAMPLE MERA4 GROUNDWATER P.I.D.READING/ODOR: NIA GAS <br /> TOP OF CASING EL ATION: MSL COLOR: BROWN TO CLEAR <br /> DEPTH TO WATER: (feet100th'3) 2855 FEET CALC.PURGE VOL.: 565488 GAL <br /> DEPTH OF WELL: (feet.100th's) 6320 FEET TOTAL VOLUME PURGED: 18 GAL <br /> ISTANDING WATER COLUMN: 3465 FEET DEPTH OF PUMP. N/A FEET <br /> FIELD PARAMETERS <br /> I <br />' TIME CASING DRAW PUMPING pH E.C. TEMP O.R P. DISSOLVEJU TURBIDITY <br /> VOLUME DOWN RATE OXYGEN COLOR <br /> PER PURGE (D.T.W) (Grmf .PM) (unita) (A4smHos) (Ceia—) (MV01ts) (PPM) (N T U) <br /> 0 NIA 5 GPM 6$9 652 20 9 NIA BROWN <br /> 6 679 645 20 -17 " " <br /> 12 678 647 20 -18 CLEAR <br /> 18 " 678 642 199 -24 " <br /> PURGE METHOD DEDICATED WATERRA PUMP <br /> SAMPLE METHOD DEDICATED WATERRA PUMP <br /> D T W AFTER PURGE: D T W AT SAMPLE TIME 32 61' <br /> WELL INTEGRITY CAP&SEAL ARE SECURE <br /> WELL LOCATION SFE SITE MAP <br /> REMARKS <br /> WEATHER GEAR SKIES WIND NW5 <br /> UALITY CONTROL ALL PURGING E UIPMENT AND SAMPLING EQUIPMENT WAS CLEANED IN THE <br /> FIELD WITHA STEAMCLEAND2 do ALCONOX SOAP NEW NITRILE GLOVES <br /> CONTAINMENT' DOT 1755 GAL STEEL DRUM OR 60 GAL POLYDRUM <br /> i <br /> INSTRUMENTATION Y S I 3560FLOWCELI. Y S L DISSOLVED OXYGEN METER <br /> SOLINIST SLOPE METER THFRMODINE 580B P I D <br /> KECK INTERFACE ME'IF.It TU mn y METER <br /> t <br /> I <br /> i <br />