My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0009218
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
2315
>
2900 - Site Mitigation Program
>
PR0544690
>
ARCHIVED REPORTS XR0009218
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/24/2019 1:09:14 PM
Creation date
7/24/2019 11:48:06 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0009218
RECORD_ID
PR0544690
PE
3528
FACILITY_ID
FA0005839
FACILITY_NAME
CASTLE AUTOMOTIVE REPAIR INC.
STREET_NUMBER
2315
Direction
N
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95204
APN
12510017
CURRENT_STATUS
02
SITE_LOCATION
2315 N EL DORADO ST
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
78
PDF
View images
View plain text
Wm_ .J_ Hur�tr S� Associa tis <br /> 1 <br /> TABLES <br />' TABLE I LABORATORY RESULTS OF SOIL SAMPLES TAKEN AFTER REMOVAL <br /> OF GASOLINE UST' S <br />' TABLE II LABORATORY RESULTS OF SOIL SAMPLES TAKEN FROM BENEATH <br /> REMOVED WASTE OIL TANK <br /> TABLE III LABORATORY RESULTS OF SOIL SAMPLE TAKEN 6/15/1.987 FROM <br /> BELOW SITE OF WASTE OIL TANK <br /> TABLE IV LABORATORY RESULTS OF SOIL SAMPLE TAKEN 8/14/1987 AT <br /> 13 1/2 FEET BELOW SITE OF WASTE OIL TANK <br /> TABLE V LABORATORY RESULTS OF TESTS FOR BTEX & TPH OF SOIL <br />' SAMPLES TAKEN OCTOBER 27 & 28, 1993 <br /> TABLE VI LABORATORY RESULTS OF TESTS FOR Ca, Cr, Pb, Ni., & Zn <br /> OF SOIL SAMPLES TAKEN OCTOBER 27 & 28, 1993 <br />' TABLE VII LABORATORY RESULTS OF TEST FOR CHLORONATED SOLVENTS, <br /> (EPA 8010, ) OF SOIL SAMPLES TAKEN OCT. 27 & 28, 1993 <br /> TABLE VIII LABORATORY RESULTS OF SOIL SAMPLES TAKEN SEPTEMBER 30, <br />' 1994 DURING PLACEMENT OF MONITORING WELL <br /> TABLE IX LABORATORY RESULTS OF WATER SAMPLES TAKEN OCTOBER 3 , <br /> 1994,AFTER COMPLETION OF MONITORING WELL <br /> TABLE X LABORATORY RESULTS OF WATER SAMPLE FROM MONITORING <br /> WELL #1 TAKEN MARCH 17, 1995 <br /> TABLE XI LABORATORY RESULTS OF SOIL SAMPLES FROM MONITORING <br /> WELLS #2 & #3 TAKEN JUNE 1, 1995 <br />' TABLE XII LABORATORY RESULTS OF WATER SAMPLES FROM MONITORING <br /> WELLS #2 & #3 TAKEN JUNE 8, 1995 <br /> TABLE XIII LABORATORY RESULTS OF SOIL SAMPLES TAKEN JUNE 23 , 1996 <br /> FROM SOIL BORING "B" & MONITORING WELLS #4, #5, & #6 <br /> TABLE A SUMMARY OF WATER ANALYSES FROM WELLS SINCE MONITORING <br /> BEGAN <br /> EXHIBITS <br /> ' <br /> EXHIBIT A WJH WORKPLAN ADDENDUM <br /> EXHIBIT B LABORATORY ANALYSES OF SOIL SAMPLES & CHAINS OF <br /> ' CUSTODY - WORK DONE JUNE 23 , 1996 <br /> EXHIBIT C DEL-TECH GROUNDWATER FIELD REPORT DATED MARCH 17, 1995 <br /> EXHIBIT D LABORATORY ANALYSES & CHAIN OF CUSTODY, WATER SAMPLES <br /> ' FROM MONITORING WELLS TAKEN JULY 1, 1996 BY DEL-TECH <br /> EXHIBIT E MANIFESTS COVERING REMOVAL OF DRUMS OF SOIL FROM <br /> PREVIOUS WOFK WHICH HAD BEEN STORED ON SITE <br /> EXHIBIT F COPY OF SURVEYORS FIELD REPORT SHOWING WELLHEAD ELEVA- <br /> TIONS OF NEW MONITORING WELLS <br />
The URL can be used to link to this page
Your browser does not support the video tag.
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).