Laserfiche WebLink
Table 3 <br /> Vertical Groundwater Gradient Calculations <br /> Valentine(Ca_ sM Motors) <br /> (feet above MSL) <br /> Mid Points Vertical <br /> Date Well Pair IL-BS&TS gwl/ts bs/bs Vert Head Vert Dist Gradient <br /> 11-Dec-01 MW-3 -37.58 -22.23 -52.92 6.132 101.56 0.06 <br /> MW-201 -139.13 -137.88 -140.38 <br /> 27-Feb-02 MW-3 -36.49 -20.05 -52.92 -0.600 102.65 0.01 <br /> MW-201 -139.13 -137.88 -14038 <br /> j 06-Jun-02 MW-3 -36.68 -20.44' -52.92 -11.060 102.45 -0.11 <br /> MW-201 -139.13 -137.88 -140.38 <br /> E, <br /> } <br /> ` E <br /> w� <br /> I <br /> 5 <br /> .4 i <br />