Laserfiche WebLink
4eologual7-eChnks Inc Page 6 <br /> Groundwater Monitoring Report <br /> Project No 723 2 <br /> } March 15,2002 <br /> Recommendations <br /> ' 1 Additional groundwater monitoring wells are needed to define the lateral extent of the <br /> plume off site GTI proposes installing two well pairs (shallow and intermediate wells) <br /> ' MW-7/MW-107 & MW-8/MW-108 to the north and northeast of the site respectively — <br /> see Figure 2 for proposed well locations A deep well is also needed in the location of <br /> well MW-4 GTI proposes to install well MW-104 adjacent to well MW-4 to further <br /> define the up gradient plume <br /> 2 Continue quarterly groundwater monitoring, with the next monitoring event scheduled <br /> in March 2002 <br /> 3 Due to the infrequent detection of the oxygenated fuel compounds at this site, future <br /> quarterly monitoring events will not include analysis by EPA method 8260 However, <br /> testing for MTBE by 8020/602 is justified <br /> ' 4.0 LIMITATIONS <br /> This report was prepared in accordance with the accepted standards and practices of the <br /> field of environmental geology, groundwater hydrology and good business practices It <br /> should be recognized that definition and evaluation of environmental conditions is a <br /> difficult and inexact science Judgments leading to conclusions and recommendations are <br /> generally made with an incomplete knowledge of the site-specific conditions present <br /> The tasks proposed and completed during this project were reviewed and approved by the <br />' local regulatory agency for compliance with the law No warranty, expressed or implied, <br /> is made <br /> 1 <br /> 1 <br />