Laserfiche WebLink
DEL-TECH GEOTECHNICAL SUPPORT SERVICES <br /> MONITORING WELL FIELD LOG 2001 <br /> ' SAMPLE LOCATION/MW - 3 DATE 9/12/01 <br /> PROJECT NAME CASTLE MOTORS ANALYSIS PERFORMED SEE CHAIN OF CUSTODY <br /> ADDRESS 2315 N EL DORADO SAMPLE TIME 1015 <br /> CITY,STATE STOCKTON,CA SAMPLE CONTAINERS 2 VOA'S <br /> ' SITE CONTACT PRESERVATIVES HCL <br /> CONSULTANT GEOLOGICAL TECHNICS LAB ANALYSIS BY SHERWOOD LABS <br /> ' PROJECT MANAGER RAY KABLANOW MONUMENT FLUSH <br /> SAMPLER A DEL-TECH WELL CASING MATERIAL PVC <br /> SIGNED WELL CASING DIA 2" / 0 1632 <br /> SAMPLE MEDIA' GROUNDWATER P I D READING/ODOR N/A GAS TOP OF CASING ELEVA ION MSL COLOR LIGHT GREY TO CLEAR <br /> DEPTH TO WATER (feet 100th's) 32 10 FEET CALC PURGE VOL 501 GAL <br /> DEPTH OF WELL (feet 10Qth's) 6280 FEET TOTAL VOLUME PURGED 15 GAL <br /> STANDING WATER COLUMN 3070 FEET DEPTH OF PUMP N/A FEET <br /> FIELD PARAMETERS <br /> TIME CUMULATIVE DRAW PUMPING pH E C TEMP ORP DISSOLVED TURBIDITY <br /> CASING VOLUME DOWN RATE OXYGEN COLOR <br />' PER PURGE (DTW) (GPMlLPM) (units) (MsMHOS) (Celsius) (Mvolts) (PPM) (N T U) <br /> 0 N/A 5 GPM 681 668 202 -I22 N/A LT GREY <br /> 5 " 680 657 202 -120 " <br />' 10 to 679 657 201 -118 CLEAR <br /> 15 679 658 201 -115 " <br />' PURGE METHOD DEDICATED W <br /> ATERRA PUMP <br /> SAMPLE METHOD DEDICATED WATERRA PUMP <br /> D T W AFTER PURGE D T W AT SAMPLE TIME 38 73' <br /> WELL INTEGRITY CAP& SEAL ARE SECURE <br /> WELL LOCATION SEE SITE MAP <br />' REMARKS <br /> WEATHER CLEAR SKIES WIND NW5 <br /> QUALITY CONTROL ALL PURGING E UIPMENT AND SAMPLING EQUIPMENT WAS CLEANED IN THE <br /> FIELD WITH A STEAMCLEANER&ALCONOX SOAP NEW A'ITRILE GLOVES <br /> CONTAINMENT D O T 17 55 GAL STEEL DRUMOR 60 GAL POLYDRUM <br />' INSTRUMENTATION Y S 1 3560 FLOWCELL Y S I DISSOLVED OXYGEN METER <br /> SOLINIST SLOPE METER THERMODINE 580B P I D <br /> KECK INTERFACE METER TURBIDITY METER <br /> 1 � <br />