My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0009280
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
2315
>
2900 - Site Mitigation Program
>
PR0544690
>
ARCHIVED REPORTS XR0009280
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/24/2019 1:13:55 PM
Creation date
7/24/2019 11:53:28 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0009280
RECORD_ID
PR0544690
PE
3528
FACILITY_ID
FA0005839
FACILITY_NAME
CASTLE AUTOMOTIVE REPAIR INC.
STREET_NUMBER
2315
Direction
N
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95204
APN
12510017
CURRENT_STATUS
02
SITE_LOCATION
2315 N EL DORADO ST
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
'Utogcc"t Technics Inc Page 7 <br /> Additional Site Characterization Work Plan <br /> Project No 724 2 <br /> June 27,2002 <br />' achieved by pumping a neat cement grout (augmented with < 4% bentonite) via a tremae <br /> tube The wells will be secured with locking watertight caps encased in flush mounted <br />' traffic rated well boxes (See Figure 7 for a schematic of monitoring well construction) <br /> 2 4.4 Monitoring Well Development <br />' After the well sealing materials have set (>24 hours) the wells will be developed (using <br /> mechanical surging and pumping methods) until a clear stream of water is obtained The <br /> well will be purged and groundwater samples collected no sooner than 48 hours after well <br />' development All development and purge water will be containerized in 55-gallon DOT <br /> approved containers and stored on site until their disposition can be arranged <br />' The exceptions to this procedure are the deep wells that will be developed immediately after <br /> installation This will consist of lowering a stainless steel bailer into the well and purging it <br /> until clean water is produced in the well <br /> 2.4.5 Well Head Elevation & Location Survey <br /> In accordance with Assembly Bill 2886, a licensed surveyor will determine the location and <br />' elevation of the new wells The surveyor will reference the casings into a benchmark <br /> elevation and this data will be included in future groundwater monitoring reports <br /> 2.5 Groundwater Monitoring <br />' The new wells will be incorporated into the current quarterly sampling/monitoring schedule <br /> 2.5.1 Groundwater Sampling Procedure <br /> ' Before sampling is attempted, the wells will be sounded for depth to water and then a clear <br /> disposable bailer will be used to determine if floating product is present The wells will be <br /> purged of at least 3 well volumes of stagnant water using a submersible pump, a dedicated <br /> 1 Waterra pump or a stainless steel bailer Purging will continue until the temperature, <br /> conductivity, and pH of the groundwater has stabilized (<10% variation between three <br /> readings) indicating that formation water representative of aquifer conditions entering the <br /> ' well is being sampled These water quality parameters are measured at intervals of each <br /> well volume purged — AJo t- eo v-�t <br /> i <br /> LA stainless steel bailer, disposable plastic bailer or dedicated Waterra pump will be used to <br /> collect each sample Care will be taken to minimize sample agitation from the initial filling <br /> of the bailer to the transfer of the sample to the VOA vial and glass amber liter bottles <br /> ' Once the sample container is filled and capped, the bottle will be inverted, tapped, and <br /> checked for headspace bubbles The sample container is identified and labeled with a <br /> t unique designation, inserted into foam holders and placed in an ice chest cooled to 4°C for <br /> transport to the laboratory <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.