My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0009280
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
2315
>
2900 - Site Mitigation Program
>
PR0544690
>
ARCHIVED REPORTS XR0009280
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/24/2019 1:13:55 PM
Creation date
7/24/2019 11:53:28 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0009280
RECORD_ID
PR0544690
PE
3528
FACILITY_ID
FA0005839
FACILITY_NAME
CASTLE AUTOMOTIVE REPAIR INC.
STREET_NUMBER
2315
Direction
N
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95204
APN
12510017
CURRENT_STATUS
02
SITE_LOCATION
2315 N EL DORADO ST
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
GeologicalT hxusInc Page 9 <br /> Additional Site Characterization Work Plan <br /> Project No 724 2 <br /> June 27,2002 <br />' 3.0 SCHEDULE & REPORTING <br /> Geological Technics Inc anticipates beginning fieldwork no later than 30 days after work <br /> ' plan approval and upon issuance of the drilling pen-nit The information gathered during <br /> this phase of work will be presented in a report that will include a summary of the geology <br /> ' Dr Ray Kablanow, a registered professional geologist, will supervise the project Copies of <br /> the report will be forwarded to both the appropriate County and State regulatory agencies <br /> (SJC/EHD and CRWQCB-CVR) Groundwater monitoring will occur on a quarterly basis <br /> ' A report will be issued for each monitoring event and submitted to the County and State <br /> agencies <br /> 4.0 SIGNATURES & CERTIFICATION <br /> Geological Technics Inc will perform this project in accordance with accepted geologic and <br /> hydrologic standards of the State of California accepted and in effect at the time of this <br /> investigation Geological Technics Inc is not responsible for undisclosed conditions <br /> This work plan was prepared by <br /> ' i seph Angulo <br /> G loge t <br /> Rt KA i R <br /> Raynold I Kablanow II, Ph D i tq0 523A <br /> California Registered Geologist 95234 s S 31.-0 P <br /> ' Registered Environmental Assessor#901 �qhi OF CAV' <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.