Laserfiche WebLink
GeologicalT hxusInc Page 9 <br /> Additional Site Characterization Work Plan <br /> Project No 724 2 <br /> June 27,2002 <br />' 3.0 SCHEDULE & REPORTING <br /> Geological Technics Inc anticipates beginning fieldwork no later than 30 days after work <br /> ' plan approval and upon issuance of the drilling pen-nit The information gathered during <br /> this phase of work will be presented in a report that will include a summary of the geology <br /> ' Dr Ray Kablanow, a registered professional geologist, will supervise the project Copies of <br /> the report will be forwarded to both the appropriate County and State regulatory agencies <br /> (SJC/EHD and CRWQCB-CVR) Groundwater monitoring will occur on a quarterly basis <br /> ' A report will be issued for each monitoring event and submitted to the County and State <br /> agencies <br /> 4.0 SIGNATURES & CERTIFICATION <br /> Geological Technics Inc will perform this project in accordance with accepted geologic and <br /> hydrologic standards of the State of California accepted and in effect at the time of this <br /> investigation Geological Technics Inc is not responsible for undisclosed conditions <br /> This work plan was prepared by <br /> ' i seph Angulo <br /> G loge t <br /> Rt KA i R <br /> Raynold I Kablanow II, Ph D i tq0 523A <br /> California Registered Geologist 95234 s S 31.-0 P <br /> ' Registered Environmental Assessor#901 �qhi OF CAV' <br /> 1 <br />