Geological recknus Inc Page 2 <br /> Additional Site Characterization Work Plan <br /> Project No 724 2 <br /> June 27,2002 <br /> presence of significant levels of BTEX, MTBE and TPH-G The results also <br /> indicated that the pump-island was a major source of contamination <br />' • In September and October 1997 five Strataprobe soil borings (SP-1, SP-4 SP-5, SP- <br /> 5A & SP-6) were installed at the site Groundwater samples collected from these <br /> borings indicated the presence of low to moderate levels of TPH-G to a depth of 60 <br />' feet bgs <br /> • In August 1999, one deep screened monitoring well (MW-101) and one soil boring <br /> SB-201 were installed at the site The purpose of these borings was to define the <br /> vertical extent of the groundwater plume Soil samples collected by use of the <br /> SimulProbe Maxitool from the soil borings tested positive for BTEX and TPH-G <br /> compounds to a depth of 111 feet Porewater samples, also collected with the <br /> SimulProbe, revealed the presence of BTEX and TPH-G to a depth of 111 feet bgs <br /> • An abandoned domestic well located at an adjacent residence was destroyed in <br /> accordance with SJC/EHD directives on April 20, 2001 <br /> • A discretely screened deep well (MW-201) was installed in October 2001 The <br /> results of this endeavor suggested that the contamination extended to a depth of 128 <br />' feet below grade surface (bgs) This depth was the target of a SimulProbe'sampling <br /> effort and the soil sample from this elevation contained detectable TPH-G <br /> • Thiee quarterly monitoring events have been completed since the installation of <br /> deep well MW-201 This well was completed with a screened interval of 148 <br /> 150 5 feet bgs <br /> i2.0 PROPOSED INVES'T'IGATION <br /> In their letter correspondence dated April 29, 2002, the SJC/EHD instructed Mr Valentine <br /> to submit a work plan for additional site characterization The directive contained the <br /> following specific elements <br /> I The work plan must address the definition of the vertical and lateral extent of the <br />' contamination under the same scope of work, <br /> 2 The vertical extent of the contamination must be defined first, with lateral definition <br /> to follow, <br /> 3 A site conceptual model with geologic cross sections must be included <br /> 2.1 Site Conceptual Model <br />' Geological Technics Inc (GTI) has developed a site conceptual model in accordance with <br /> the SJC/EHD directive and has completed cross section diagrams (see Figures 5 - 6) To <br />' k date, a total of 19 borings have been completed at the site, which measures approximately <br /> 3b+, 80 x 65 ft With the exception of the five Stratprobe borings in 1997, no off site <br /> characterization has occurred since the USTs were removed in 1987 When the Strataprobe <br /> 1 <br />