Laserfiche WebLink
DEL-TECH GEOTECHNICAL SUPPORT SERVICES <br /> MONITORING WELL FIELD LOG 2004 <br />' SAMPLE LOCATION 1 MW- 101 DATE: 3121/2004 <br />' PROJECT NAME CASTLE MOTORS ANALYSIS PERFORMED SEE CHAIN OF CUSTODY <br /> ADDRESS. 2315 N ELDORADO SAMPLE TIME 1115 <br /> CITY,STATE STOCKTON, CA SAMPLE CONTAINERS 4 VOA'S <br />' SITE CONTACT PRESERVATIVES. HCL <br /> CONSUL'T'ANT GEOLOGICAL TECHNICS LAB ANALYSIS BY CLS LABS <br />' PROJECT MANAGER JOE ANGULO MONUMENT FLUSH <br /> SAMPLER DEL-TECH WELL CASING MATERIAL PVC <br /> SIGNED WELL CASING DIA 2" / 0 1632 <br /> SAMPLE MEDIA GROUNDWATER P I D READING/ODOR N/A SULFUR <br /> OF CASING ELEVA ON MSL COLOR CLEAR <br /> DEPTH TO WATER (feet 100th'sl 3368 FEET CALC PURGE VOL 1032 GAL <br /> DEPTH OF WELL feet 100th's 9694 FEET TOTAL VOLUME PURGED 3097 GAL <br /> STANDING WATER COLUMN 6326 FEET I DEPTH OF PUMP 95 FEET <br /> FIELD PARAMETERS <br /> TIME CUMULATIVE DRAW PUMPING pH E C. TEMP O.R.P DISSOLVED TURBIDITY <br /> CASING VOLUME DOWN RATE OXYGEN COLOR <br />' PER PURGE (D T W) (GPMILPM) (units) (MsMHOS) (Celsius) (Mvolts) (PPM) (N T U) <br /> 0 N/A 5 GPM 722 772 196 -185 125 CLEAR <br /> 1032 715 776 20 -319 14 <br />' <br /> 2065 740 744 193 -405 1 23 " <br /> 3097 720 766 195 -449 098 " <br />' PURGE METHOD DEDICATED WATERRA PUMP <br /> SAMPLE METHOD DEDICATED WATERRA PUMP <br />' D T W AFTER PURGE D T W AT SAMPLE TIME 52 12' <br /> WELL INTEGRITY CAP&SEAL ARE SECURE <br /> WELL LOCATION SEE SITE MAP <br />' REMARKS <br /> WEATHER CLEAR SKIES WIND <br />' QUALITY CONTROL ALL PURGING EQUIPMENT AND SAMPLING EQUIPMENT WAS CLEANED IN THE <br /> FIELD WITH A STEAMCLEANER&ALCONOX SOAP NEW NITRILE GLOVES <br /> CONTAINMENT D 0 T 1755 GAL STEEL DR UM OR 60 GAL POLY DR UM <br />' INS'T'RUMENTATION Y S I 3560 FLOWCELL Y S I DISSOLVED OXYGEN METER <br /> SOLINIST SLOPE METER T14ERMODINE 5808 P 1 D <br /> KECK INTERFACE METER TURBIDITY METER <br /> 1 <br />