My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0009289
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
2315
>
2900 - Site Mitigation Program
>
PR0544690
>
ARCHIVED REPORTS XR0009289
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/24/2019 1:17:15 PM
Creation date
7/24/2019 11:58:17 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0009289
RECORD_ID
PR0544690
PE
3528
FACILITY_ID
FA0005839
FACILITY_NAME
CASTLE AUTOMOTIVE REPAIR INC.
STREET_NUMBER
2315
Direction
N
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95204
APN
12510017
CURRENT_STATUS
02
SITE_LOCATION
2315 N EL DORADO ST
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
85
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
16 <br /> Ceotogical Tecimics Inc. <br /> ' 110 1 7"h Street <br /> Modesto,California 95354 <br /> (209)522-4119/Fax(209)522-4227 <br /> 1 <br /> February 21, 2006 <br /> Project No 7232 <br /> ' Project Name Valentine <br /> Mr Stephen Valentine <br /> 6232 Hemet Ave <br /> Stockton, CA 95207 <br /> RE Report 4th Quarter 2005 Groundwater Monitoring <br /> Location Castle Motors, 2315 N El Dorado St , Stockton, CA <br /> ' Dear Mr Valentine <br /> Geological Technics Inc has prepared the following Report for the 4th Quarter 2005 <br /> Groundwater Monitoring work at 2315 N El Dorado St The report details the completion of <br /> a groundwater monitoring event on November 19, 2005 <br /> ' Work plans for interim site remediation and additional site characterization have been <br /> submitted to the SJC/EHD for approval Both work plans have been approved and are in the <br /> ' process of being implemented The CPT borings to define the groundwater plume to the <br /> northeast of the site are tentatively scheduled for the week of February 20, 2006 <br /> ' If you have any questions, please contact me at (209) 522-4119 <br /> ' Respectfully submitted, <br /> Raynold I Kablanow II, Ph D <br /> Vice President <br /> ' cc Jeff Wong— SJC PHS/EHD <br /> James Barton - CRWQCB-CVR <br />
The URL can be used to link to this page
Your browser does not support the video tag.