My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0009295
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
2315
>
2900 - Site Mitigation Program
>
PR0544690
>
ARCHIVED REPORTS XR0009295
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/24/2019 1:21:42 PM
Creation date
7/24/2019 1:00:50 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0009295
RECORD_ID
PR0544690
PE
3528
FACILITY_ID
FA0005839
FACILITY_NAME
CASTLE AUTOMOTIVE REPAIR INC.
STREET_NUMBER
2315
Direction
N
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95204
APN
12510017
CURRENT_STATUS
02
SITE_LOCATION
2315 N EL DORADO ST
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
146
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br /> C70010gica l Tocklucs lftc. <br /> ' 1101 7h Street <br /> Modesto,California 95354 <br /> (209)522-4119/Fax(209)522-4227 <br /> 1 <br /> June 16, 2006 <br /> ' Project No 7232 <br /> Project Name Valentine <br /> Mr Stephen Valentine <br /> 6232 Hemet Ave <br /> ' Stockton, CA 95207 <br /> RE Report— Site Conceptual Model (Revised June 2006) <br /> ' Location Castle Motors, 2315 N El Dorado St , Stockton, CA <br /> Dear Mr Valentine <br /> ' Geological Technics Inc has prepared the following Site Conceptual Model Report -- June <br /> 2006 Revision for the above property at 2315 N El Dorado St in Stockton The report <br /> incorporates new data obtained during field activities completed on February 21 - 23, 2006 <br /> In GTI's opinion this report completes the site investigation phase for the project and we can <br /> now concentrate on cleaning up the residual contamination discovered 19 years ago during <br /> ' underground storage tank removal activities in 1987 <br /> A work plan for interim site remediation has been submitted to the SJC/EHD for <br />' consideration The work plan was approved and the installation of a dual phase extraction <br /> system is in the process of being implemented Natural gas service from PG&E and building <br /> permits are still being negotiated but we anticipate the system will be started some time this <br /> summer of 2006 <br /> If you have any questions or need additional information, please contact me Thank you for <br />' this opportunity to serve your environmental needs <br /> Sincerely, <br /> ' Raynold I Kablanow H, Ph D <br /> Vice President <br /> ' cc Jeff Wong— SJC PHS/EHD <br /> James Barton - CRWQCB-CVR <br /> USTCFP <br />
The URL can be used to link to this page
Your browser does not support the video tag.