My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0009296
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
2315
>
2900 - Site Mitigation Program
>
PR0544690
>
ARCHIVED REPORTS XR0009296
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/24/2019 1:19:43 PM
Creation date
7/24/2019 1:01:38 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0009296
RECORD_ID
PR0544690
PE
3528
FACILITY_ID
FA0005839
FACILITY_NAME
CASTLE AUTOMOTIVE REPAIR INC.
STREET_NUMBER
2315
Direction
N
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95204
APN
12510017
CURRENT_STATUS
02
SITE_LOCATION
2315 N EL DORADO ST
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
97
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Geological Tech�ta Inc. <br /> ' 1 101 7'h Street <br /> Modesto Califomia 95354 <br /> t (209)522-4119/Fax(209)522-4227 <br /> April 24, 2006 <br /> ' <br /> Project No 7232 <br /> Project Name Valentine <br /> ' Mr Stephen Valentine <br /> t 6232 Hemet Ave <br /> Stockton, CA 95207 <br /> RE Report 1" Quarter 2006 Groundwater Monitoring <br /> Location Castle Motors, 2315 N El Dorado St , Stockton, CA <br /> ' Dear Mr Valentine <br /> Geological Technics Inc has prepared the following Report for the 1 S' Quarter 2005 <br /> M Groundwater Monitoring work at 2315 N El Dorado St The report details the completion of <br /> a groundwater monitoring event on January 17, 2006 <br />' A work plan for interim site remediation has been submitted to the SJC/EHD for <br /> consideration The work plan was approved and the installation of a dual extraction system is <br /> in the process of being implemented Natural gas service from PG&E and building permits <br />' are still being negotiated but we anticipate the system will be started before summer <br /> In late February 2005, a leaky water was noted on EI Dorado Street next to the contamination <br /> site We notified the City water company (CWS) and requested that it be fixed ASAP A site <br /> inspection on March 9, 2006 noted that it had been fixed <br />' If you have any questions, please contact me at (209) 522-4119 <br /> Respectfully submitted, <br /> 'D 4 �, �L.)- <br />' Raynold I Kablanow U, Ph D <br /> Vice President <br />' cc Jeff Wong-SJC PHS/EHD <br /> James Barton - CRWQCB-CVR <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.