My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
2320
>
2900 - Site Mitigation Program
>
PR0519126
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/24/2019 1:33:51 PM
Creation date
7/24/2019 1:15:55 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0519126
PE
2950
FACILITY_ID
FA0014313
FACILITY_NAME
SHELL FOOD MART
STREET_NUMBER
2320
Direction
N
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95204
APN
12521030
CURRENT_STATUS
01
SITE_LOCATION
2320 N EL DORADO ST
P_LOCATION
01
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
73
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ir <br /> I <br /> Shell Sites <br /> Page 3 <br /> i <br /> 6131 Pacific Avenue.Stockton <br /> I4 A Remedial Action Plan was to be submitted on November 21,2005. Shell is in the process of <br /> obtaining permits from OMI (City of Stockton) for disposal of extracted groundwater and Air <br /> Pollution Control for discharge of treated extracted vapor to the air from the interim and permanent <br /> dual phase extraction (DPE) system. Shell expects to have the DPE equipment on site in January <br /> 2006. <br /> 3725 Tracy Blvd,Tracy <br /> An SCM is being prepared for this site. Batch extraction of ground water was performed and results <br /> of quarterly groundwater sampling have shown no rebound of contaminants. Chevron has a <br /> monitoring well cross gradient from the Shell site that has about 300 ug/I of MTBE so Shell may <br /> need to place a monitoring well between the two sites. To justify closure of the site Shell should <br /> contour or otherwise utilize the Chevron and Shell data to show the MTBE is not from Shell. <br /> 880 Victor Road,Lodi <br /> A temporary groundwater extraction system has been in operation since September 29,2005. . <br /> Information on extraction of water from MW2 (4 inch well) and MW4 (6 inch well)will be included <br /> in the next quarterly report. Installation of additional on-site monitoring wells and a soil boring were <br /> I performed November 21 through 28, 2005. <br /> 4315 Waterloo Road Stockton <br /> The work plan submitted on July 5,2005,was approved by EHD on November 9,2005. The work <br /> is scheduled to be performed on December 12 through 16, 2005. <br /> i <br /> 1160 Yosemite Avenue.Manteca <br /> jAn SCM is to be prepared and Shell may be able to justify closure of the site. <br /> If you have any questions or comments please contact the appropriate LOP staff overseeing the site <br /> or call me at(209) 468-3449. <br /> + Donna Heran,RENS,Director <br /> +� <br /> Environmental Health Department <br /> 3 Margaret Lagorio, Supervising REHS <br /> Site Mitigation Unit <br /> c: CVRWQCB—James L. L.Barton,RG <br /> Cambria—Joe Neely,Aubrey Cool <br /> I <br /> i <br /> ji <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.