Laserfiche WebLink
j <br /> C A M B R I A <br /> f <br /> SCHEDULE j <br /> Cambria will submit the file review request to SJCEHD, and we are prepared to begin field work . I <br /> upon completion of the file review, approval of the work plan by SJCEHD, and receipt of the I <br /> appropriate permits. Cambria will notify SJCEHD of the field schedule at least 48 hours (two <br /> working days)prior to commencing field work. <br /> Closing <br /> If you have any questions regarding the scope of work outlined in this work plan, please call <br /> Aubrey Cool at(510) 420-3336. j <br /> Sincerely, <br /> Cambria Environmental Technology, Inc. <br /> \�ERED <br /> S6 f plD <br /> K <br /> Aubrey K. Cool, RG Q�� JOKEY Cep CN <br /> Project Geologist <br /> RG 7659 • • <br /> N0. 7659 <br /> 4P �P <br /> 9 <br /> 'FoF ca��F°tea <br /> Attachments: <br /> Figure 1. Site Vicinity/Well Survey Map <br /> Figure 2. Groundwater Contour/Chemical Concentration/Proposed Boring Location Map <br /> cc: Ms.Karen Petryna, Shell Oil Products US, 20945 S. Wilmington Ave., Carson, CA 90810 <br /> Mr. James Barton, Central Valley Regional Water Quality Control Board, 11020 Sun <br /> Center Drive, #200,Rancho Cordova, CA 95670 <br /> Mr. Jon Schultz, CB Richard Ellis, Inc., 555 Capitol Mall, Suite 100, Sacramento, CA <br /> 95814 ` <br /> Mr. Aaron Retts, CB Richard Ellis, Inc. f( <br /> 1641 5 <br />