My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
2320
>
2900 - Site Mitigation Program
>
PR0519126
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/24/2019 1:33:14 PM
Creation date
7/24/2019 1:17:00 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0519126
PE
2950
FACILITY_ID
FA0014313
FACILITY_NAME
SHELL FOOD MART
STREET_NUMBER
2320
Direction
N
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95204
APN
12521030
CURRENT_STATUS
01
SITE_LOCATION
2320 N EL DORADO ST
P_LOCATION
01
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
)1 - Mr Frank Girardi <br /> December 3,2007 <br /> CONESTOGA-ROVERS - <br /> &ASSOCIATES - <br /> I <br /> • Groundwater flow direction beneath the site is somewhat variable, but is predominantly towards the <br /> northeast. <br /> • Upgradient assessment is not warranted due to the presence of the adjacent upgradient Castle Motors <br /> site. <br /> • The horizontal extend of impacted,groundwaterto the south and east is generally defined by wells <br /> MW-4 and MW-6,respectively. <br /> • The vertical extent of impacted onsite soil and groundwater is unknown. <br /> • The horizontal extent of impacted groundwater southeast of well MW-5 and at the northern boundary <br /> of the site is unknown <br /> • Shell proposes drilling three-soil borinss to assess thcfvertic`al`exfent of impacted onsite soil and <br /> groundwater. <br /> • Shell proposes drilling,ftwo`soi s to assess therhor�izontal extent-of impacted soil and <br /> ��-- <br /> groundwater southeast of well MW-5 and at the northern boundary of the site. The borings will be <br /> converted to groundwater monitoring wells. <br /> -a <br /> WORK TASKS = _ <br /> is <br /> Permits: A permit for drilling will be obtained from the SJCEHD. <br /> Health and Safety Plan:A site-specific.Health and Safety Plan will be prepared for fieldwork.. <br /> Utility Clearance: The proposed drilling locations will be marked and the locations cleared through <br /> Underground Service Alert and a private underground utility locating company prior to drilling: <br /> ii <br /> Site Investigation: Five exploratory soil borings (CPT-1 through CPT-3, MW-71 and MW-8) will be <br /> drilled at the locations shown on Figure 2 using hollow-stem auger (HSA) or cone penetration testing <br /> (CPT)equipment. The HSA borings will be converted to groundwater monitoring wells. <br /> i <br />{ Borings.CPthrough-CRT-3 will be electronically logged using CPT logging techniques. Borings <br /> CPT-1 through CPT-3 will be.. a�c_ed-to 80 feet below grade (fb)to assess the vertical extent of <br /> impacted soil and groundwater beneath-the site. Soil samples will be collected and submitted for analysis <br /> from borings CPT-1 through CPT-3 at.5-foot intervals. Soil samples will be screened in the field for <br /> organic vapors using a photo-ionization detector. all <br /> (Groundwater sampling.intervals.for borings CPT-1 through CPT-3 will be.determined m the field based? <br /> Y g'i� g �.� _._ feed in the " <br /> on the,soil es identified b the eleetromc to Moderate to hi h_P ermeabih soils idents <br /> 1641 3 <br /> Worldwide Engineering,Environmental,Construction,and IT Services <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.