Laserfiche WebLink
UNIT 1V LOP <br /> NO FURTHER ACTION (NFA) CLOSURE CHECK LIST �I <br /> SITE ADDRESS: 7�• �10��OP STAFF: JU d�VA <br /> SITE NAME: 1 TALI cs+l ,pYu <br /> DATE <br /> V NFA requested by RP or proposed by LOP Staff. 0" <br /> V <br /> / LOP Staff reviewed site with PG/Management. Geotracker"Closure Review"screen still marked "No"at"Is This <br /> V Case Ready For Closure?" <br /> LOP Staff submits Case Closure Summary(CCS)and chronology to PG/Management. <br /> all9 PG/Management approves staff's CCS and chronology submittal. <br /> iV LOP Staff advises CVRWQCB of NFA consideration, by e-mail with a cc to PG/Management. <br /> LOP staff and PG/Management discuss NFA consideration with CVRWQCB at Unit Meeting. <br /> LOP Staff mails notification letter to CVRWQCB of LOP's intention to issye a NFA that includes the CCS (with <br /> Managements' signature)and chronology. 30 day response date up: � CVRWQCB concurrence received: <br /> 30-day extension requested to: Non-concurrence letter from CVRWQCB Management received: <br /> Documentation received and flagged that indicates the"current record owner(s) of fee title to the site have been <br /> notified", per Section 25297.15 (a). The NFA closure letter may not be issued without this documentation. <br /> V LOP Staff notifies RP to destroy all wells, remove all site waste material, and provide documentation that the waste <br /> material was properly disposed of. A10 wQLLS 7grgLi i0 <br /> LOP Staff documents destruction of all monitoring wells. Geotracker"Groundwater Monitoring"screen updated to <br /> indicate wells are destroyed. The NFA closure letter may not be issued, until wells are destroyed. IV6q� <br /> 1 � LOP Staff verifies and flags documentation received indicating all on site waste material removed and properly <br /> disposed. The NFA closure letter may not be issued without this documentation. Geotracker"Closure <br /> r II Review"screen marked "Yes", at"Is This Case Ready For Closure?" <br /> LOP Staff submits site file with flagged documents, electronic drafts of NFA and CCS that has Director's signature <br /> block and date four days ahead, by e-mail to PG/Management. <br /> G I ii PG/Management reviews file and electronic drafts of the NFA and CCS. Once approved, sends e-mail to LOP staff <br /> and clerical to issue attached electronic drafts of the NFA and CCS to RP. <br /> RI Clerical staff edits and submits NFA and CCS to the Director for signatures. Signed CCS and NFA are copied. <br /> Originals mailed to RP. Copies filed into LOP File, given to Management, and uploaded into Geotracker. <br /> Clerical staff updates Envision to reflect site is Closed. <br /> 010 LOP staff pulls all site files for clerical staff to file in LOP Closed File cabinets. <br /> &1 11 LOP staff updates Geotracker`Project Information" screens to reflect site is Closed. <br />