Describe the method that will be utilized to purge and/or Inert the tank(s)s <br /> Dry ice will be added to the tanks at the rate of 20 per 19000 gallon <br /> _rapacity- for diesel and 100 per 1 . 000 gallon capacity fpr vasolina. arsi3iblLar <br /> products . <br /> b. Tank/Ptping Hauler: <br /> Name Jim Thorpe Oil , Inc . <br /> Address P . O . Sox 357City Lodi , CA Zip 95241 -0357 <br /> Phone No.( 209 ) 368 -6175 <br /> Hauler Registration 8 (if hauled as hazardous) 2667 <br /> C, Tank/Piping Disposal Site: <br /> Name Schnitzer Steel. Products <br /> Address 12000 Folsom Blvd . Cit) Rancho Cordova95742 <br /> Phone No.( 916 ) 985- 4810 <br /> EPA tuw (if transported to a permitted TSD facility) <br /> 9. Describe, in detail, how the soil and/or water sample(s) beneath the tank and piping will be obtainedt <br /> Soil samples will be taken from native soil two to three feet under the former <br /> tank locationwith a backhoe . Samples will be taken. from the bucket . Water samples . ._ . <br /> if needed , will be taken with a bailer . <br /> I0. Describe how the excavation will be backfilled with suitable material upon removals <br /> Backfill of the excavation ( s ) will be done at the appropriate time during this <br /> project . Backfill material will consist of the excavated . spoil if useable : and <br /> other clean compactable material . <br /> I I . Handling of excavated soil: <br /> a) What material will be used to line the tank pit and cover the stockpile? <br /> 6 mil. plastic sheeting . <br /> b) Cl as ill 2e Poe finardt3fininc of If,, rq?i tad stEgpife? Class 1 Chem . Waste , Kettleman Cit <br /> Depending upon the contaminate , levels of contamination and quantities of soil , <br /> the spoilwillbe hauled to either a class 1 or class 2 landfill or treated on site . <br /> e) Contaminated Soil Hazardous Waste Hauler: <br /> I <br /> Name Jim Thorpe 011 , Inc . 2667 <br /> Hauler Reghtrstlon M <br /> Address P . O . Sox 357CityLodi , CA Zip 95241 -0357 <br /> Phone No. ( 209 ) 368 - 6175 <br /> Contractor will notify USA Dig at least 48 hrs . prior to excavation <br /> Fil 23 046 ( Revised 9/ 11 /96) Page 5 <br /> 11L 7 <br /> i / a <br /> J <br />