Laserfiche WebLink
WORK PLAN ADDENDUM <br /> To the Work Plan Dated I May 2000 <br /> 1 .0 INTRODUCTION <br /> The following is a chronological listing of activities at California Tank Lines (CTL) Stockton <br /> terminal relevant to removal of underground storage tanks (USTs) and determination of the <br /> vertical and lateral extent of contamination. <br /> ACTIVITY DATE BY <br /> Remove Waste Oil USTs 1990 Bill Messick Co. <br /> Determine Extent of Contamination 1 1997 Sierra-Pacific (SP) <br /> Remove Diesel USTs 1998 Station Equip. Co . <br /> Determine Extent of Contamination 1999 Environeering, Inc. (EI) <br /> ' Reference — Work Plan Dated 08/28/ 1996 <br /> Report of Investigation Dated 02/04/ 1997 <br /> 2 Reference — Work Plan Dated 01 /28/1999 <br /> Report of Investigation Dated 02/03 /2000 <br /> By letter dated 2/29/2000, the San Joaquin County, Public Health Services, directed CTL to <br /> submit a work plan to determine the vertical and lateral definition of contamination at the site by <br /> 5/ 1/2000. CTL contracted EI to complete the required work plan for the Site at 3105 South El <br /> Dorado Street, Stockton. The location is shown in Figure 1 and 2. A work plan in response to <br /> the above letter was submitted on 1 May 2000 . <br /> i <br />;I The San Joaquin County, Public Health Services, responded to the Work Plan dated I May 2000, <br /> requiring this Work Plan Addendum extending the work outlined in the Work Plan dated 1 May <br /> 2000. <br />!i Environeering, Inc. Project No. 00-005.05 Page 1 <br />