Laserfiche WebLink
li Work Plan For Investigation of Reported Release <br /> California Tank Lines Facility <br /> Stockton, California <br /> Sierra-Pacific Project No. 96-620.01 <br /> 6.0 REMARKS AND SIGNATURES <br /> The approach used in this work plan represents our professional judgement and opinions. <br /> These opinions are based on currently available client information, and were developed in <br /> accordance with currently accepted hydrogeologic and engineering practices. Other than this, <br /> no warranty is implied or intended. <br /> SIERRA=PACIFIC GROUNDWATER CONSULTANTS, INC. <br /> This work plan was prepared by: <br /> ?, <br /> Eric D . Chase, C.E.G. 1088 Date <br /> Senior Engineering Geologist \S\G 0 , C 1pC� <br /> No. 10889rct <br /> CERTIFIED <br /> ENGINEERING <br /> This work plan was reviewed b GEOLOGIST <br /> . <br /> OF <br /> Jolu Ste hen Rapo, C.E. G. 1133 Date <br /> Seni6r,Engineering Geologist <br /> MM%/CCLWt .WPD/EDC/1LB <br /> Sierra-Pacific Groundwater Consultants, Inc. 6 <br />