Laserfiche WebLink
V i I <br /> Site Health and Safety Plan <br /> Califomia Tank Lines Facility <br /> Sierra-Pacific Project No. 96-620.01 <br /> 16.0 LIMrIATIONS <br /> This site H&SP was developed in accordance with generally accepted standards of current safety <br /> practice in the State of California. The terms of this H&SP should not be considered valid <br /> after 1 year because of the changing regulations in environmental and safety practice. Sierra- <br /> Pacific is not able to eliminate the risks associated with environmental and hazardous waste or <br /> toxic sites. No other representation and no guarantees or warrants, expressed or implied, are <br /> provided by or with this H&SP. <br /> This site H&SP has been reviewed by the following persons prior to commencing the field work: <br /> i <br /> SIERRA-PACIFIC GROUNDWATER CONSULTANTS, INC. <br /> Eric D . Chase Date <br /> Project Manager <br /> �- O ,� y <br /> John St pheo Ra p Date <br /> Senior Ertffieering Geologist <br /> 0828%.CCLH&S P.W PD/ED GILB <br /> Sierra-Pacific Groundwater Consultants, Inc. 37 <br />