My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
3105
>
2900 - Site Mitigation Program
>
PR0542208
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/13/2026 11:24:49 AM
Creation date
7/24/2019 4:30:09 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0542208
PE
2960 - RWQCB LEAD AGENCY CLEAN UP SITE
FACILITY_ID
FA0024243
FACILITY_NAME
CALIFORNIA TANK LINES
STREET_NUMBER
3105
Direction
S
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95206
APN
17512028
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\gmartinez
Supplemental fields
Site Address
3105 S EL DORADO ST STOCKTON 95206
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
294
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
purged groundwater, will be placed in 55-gallon, California Department of Transportation (DOT) rated <br /> drums which will be labeled with non-hazardous waste labels and temporarily stored on-site, pending <br /> transportation and disposal to a California licensed waste disposal facility. All IDW will be managed in <br /> accordance with State and local regulations. <br /> 5.9 Data Evaluation and Additional Site Assessment Report <br /> IES will evaluate the information and provide a detailed report documenting the additional off-site <br /> assessment activities. The results will be compiled with data previously collected and will include a <br /> complete description of the field investigation (drilling and sampling techniques), boring logs, soil and <br /> groundwater contaminant concentration and plume maps, and geologic cross section maps. This <br /> additional assessment data will allow IES to further define a site conceptual model that will assist in <br /> determining the appropriate and most cost-effective remediation alternatives. <br /> Thank you for your attention to this case. If you require any additional information regarding the <br /> Work Plan or this Addendum, please contact the undersigned . <br /> Respectfully, <br /> Q� %AAE!lG O!O <br /> Michael T.Davis,PG <br /> Principal Geologist p�F ti <br /> F---- r� <br /> cc: Mr. Allen Genetti, CPA, CFO El Dorado Land Holdings OF CAU 0¢ <br /> Enclosures: <br /> Figure 10 — Revised Proposed Groundwater Monitoring Well Locations Map (MW-15B, MW- <br /> 16C,MW-17B,MW-18C,MW-19B and MW-20C) <br /> Figure 11 — Proposed B Zone Monitoring Well Construction Details (MW-15B, MW-17B and <br /> MW-19B) <br /> Figure 12 — Proposed C Zone Monitoring Well Construction Details (MW-16C, MW-18C and <br /> MW-20C) <br /> Appendix A—AGE,Inc. Site Conceptual Model Figures 3 through 5 <br /> California Tank Lines Innovative Environmental solutions <br /> Addendum to Work Plan -8- Encinitas,California <br />
The URL can be used to link to this page
Your browser does not support the video tag.