My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
3105
>
2900 - Site Mitigation Program
>
PR0542208
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/13/2026 11:24:49 AM
Creation date
7/24/2019 4:30:09 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0542208
PE
2960 - RWQCB LEAD AGENCY CLEAN UP SITE
FACILITY_ID
FA0024243
FACILITY_NAME
CALIFORNIA TANK LINES
STREET_NUMBER
3105
Direction
S
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95206
APN
17512028
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\gmartinez
Supplemental fields
Site Address
3105 S EL DORADO ST STOCKTON 95206
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
294
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
to P-8 (part of AGE investigation of the Pacific Pride site) on the sidewalk south of MW- <1 <br /> 4. Lithologic data from the AGE Report of Investigation will be used to locate sample <br /> depths for this boring. <br /> Each CPT boring will be advanced to 125 ft. bsg. This will result in penetration of three <br /> to four water zones. Water samples will be secured from each water zone for each boring, <br /> including the boring on the sidewalk south ofMW-4 (using the AGE lithologic data). - 444 <br /> 6� 5a <br /> All samples will be secured using a hydropunch sample tool, either mounted on the CPT -Crr rig, or a separate Geoprobe. ample depths will be determined using the lithologic data <br /> generated by the CPT. The sample boring will be adjacent to the CPT boring. In addition <br /> to water samples from all borings, soil samples will be secured representative of the first <br /> water zone from the two borings on the sidewalk, north and south ofMW-4, to be <br /> analyzed for percent organic carbon by weight and total effective porosity. The <br /> associated water samples will be analyzed for dissolved oxygen, ferrous iron, nitrate and <br /> sulfate, in addition to the hydrocarbons of concern Finally, a water sample will be <br /> secured from MW4 to be analyzed for electron acceptors. These data will be used to <br /> evaluate natural attenuation at these locations. L) ) <br /> All water samples will be analyzed for hydrocarbon contaminants as follows: <br /> • TPH gasoline, diesel and motor oil using LUFT GUMS. <br /> • BTEX, TBA, MTBE, EDB, 1,2 DCA, DIPE, ETBE& TAME using EPA 8260B. <br /> Soil borings will be backfilled with cement grout, and all rinseate generated during <br /> drilling will be stored in labeled drums on-site for disposal in an approved manner. <br /> A Report of Investigation will be prepared at the completion of this work, which will <br /> include all lithologic and analytical data collected. Cross sections will be developed as <br /> shown on Figure 3, and conclusions and recommendations for fixture work will be <br /> included. <br /> I <br /> 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.