Laserfiche WebLink
1 .0 INFORMATION <br /> This Health and Safety Plan (H & SP) describes basic safety requirements for the soil and <br /> groundwater exploration at the California Tank Lines, hie. (Cal Tk) facility, located at <br /> 3105 South El Dorado Street, in Stockton California. The location of the site is shown in <br /> Figure 1 . <br /> The provisions of the plan apply to the employees of Environeering, Inc. (EI), and the <br /> contractors working on this phase of the project. The contractors may elect to increase <br /> the safety requirements for their work with prior concurrence of EI. <br /> This H & SP describes the expected potential hazards that may be encountered on site. If <br /> the site, working conditions or scope of the work for this phase of the project change <br /> before or during the field work, this H & SP will be revised in keeping with these changes <br /> by El. <br /> 2 .0 SCOPE OF WORK <br /> The scope of work for this phase of the project is described in El' s August 1 , 2006 work <br /> plan entitled DETERMINATION OF THE EXTENT OF CONTAMINATION <br /> AFFECTING MW-4, CALIFORNIA TANK LINES, INC. , 3105 SOUTH EL DORADO <br /> STREET, STOCKTON, CALIFORNIA. In summary, the field work shall include the <br /> completion of the following tasks: <br /> Advancing, logging and sampling of three (3) soil probes to a depth of 50 feet and two (2) <br /> consecutive non-contaminated (by field measures) five (5) foot samples. <br /> 3.0 GENERAL SAFE WORK PRACTICES <br /> It is EI' s safety policy to take every reasonable precaution in the performance of work to <br /> protect the environment and the health and safety of employees and the public, and to <br /> prevent property damage. With respect to hazardous agents, this protection is provided <br /> by limiting exposures of people, releases to the environment, and contamination of <br /> property to levels that are as low as reasonably achievable (ALARA). <br /> Environeering, Inc. Project No. 00-004.03 Page 1 <br />