My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
3105
>
2900 - Site Mitigation Program
>
PR0542208
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/25/2025 9:47:59 AM
Creation date
7/24/2019 4:30:09 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0542208
PE
2960 - RWQCB LEAD AGENCY CLEAN UP SITE
FACILITY_ID
FA0024243
FACILITY_NAME
CALIFORNIA TANK LINES
STREET_NUMBER
3105
Direction
S
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95206
APN
17512028
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\gmartinez
Supplemental fields
Site Address
3105 S EL DORADO ST STOCKTON 95206
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
258
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 .0 INFORMATION <br /> This Health and Safety Plan (H & SP) describes basic safety requirements for the soil and <br /> groundwater exploration at the California Tank Lines, hie. (Cal Tk) facility, located at <br /> 3105 South El Dorado Street, in Stockton California. The location of the site is shown in <br /> Figure 1 . <br /> The provisions of the plan apply to the employees of Environeering, Inc. (EI), and the <br /> contractors working on this phase of the project. The contractors may elect to increase <br /> the safety requirements for their work with prior concurrence of EI. <br /> This H & SP describes the expected potential hazards that may be encountered on site. If <br /> the site, working conditions or scope of the work for this phase of the project change <br /> before or during the field work, this H & SP will be revised in keeping with these changes <br /> by El. <br /> 2 .0 SCOPE OF WORK <br /> The scope of work for this phase of the project is described in El' s August 1 , 2006 work <br /> plan entitled DETERMINATION OF THE EXTENT OF CONTAMINATION <br /> AFFECTING MW-4, CALIFORNIA TANK LINES, INC. , 3105 SOUTH EL DORADO <br /> STREET, STOCKTON, CALIFORNIA. In summary, the field work shall include the <br /> completion of the following tasks: <br /> Advancing, logging and sampling of three (3) soil probes to a depth of 50 feet and two (2) <br /> consecutive non-contaminated (by field measures) five (5) foot samples. <br /> 3.0 GENERAL SAFE WORK PRACTICES <br /> It is EI' s safety policy to take every reasonable precaution in the performance of work to <br /> protect the environment and the health and safety of employees and the public, and to <br /> prevent property damage. With respect to hazardous agents, this protection is provided <br /> by limiting exposures of people, releases to the environment, and contamination of <br /> property to levels that are as low as reasonably achievable (ALARA). <br /> Environeering, Inc. Project No. 00-004.03 Page 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.