Laserfiche WebLink
CALIFORNIA TANK LINti Page 1 of 1 <br /> lie <br /> Path to Closure Plan GO GEOTRACKER HOME I MANAGE PROJECTS I REPORTS SEARCHOL GOUT <br /> CALIFORNIA TANK LINES(T0607700426)-MAP THIS SITE OPEN-REMEDIATION <br /> 3105 EL DORADO ST S CLEANUP OVERSIGHT AGENCIES <br /> STOCKTON,CA 95206 ACTIVITIES REPORT SAN JOAQUIN COUNTY LOP(LEAD)-CASE#:1095 <br /> CASEWORKER:VICKI MCCARTNEY-SUPERVISOR:ADRIENNE ELLSAESSER <br /> SAN JOAQUIN COUNTY PUBLICWEBPAGE CENTRAL VALLEY RWQCB(REGION 5S)-CASE#:390541 <br /> VIEW PRINTABLE CASE SUMMARY FOR THIS SITE CASEWORKER:JAMES BARTON-SUPERVISOR:COR/CONDON <br /> ASSOCIATED ENVIROSTOR PROJECTS CUF Claim#:8489 CUF Priority Assigned:C CUF Amount Paid:$331,744 <br /> THIS PROJECT WAS LAST MODIFIED BY VICKI MCCARTNEYON 10/3012013 1.32:11 PM-HISTORY <br /> THIS SITE HAS SUBMITTALS.CLICK HERE TO OPEN A NEW WINDOW WITH THE SUBMITTAL APPROVAL PAGE FOR THIS SITE. <br /> Path to Closure Plan-FY 12/13 THIS VERSION IS FINAL AS OF 10/302013 PATH TO CLOSURE HISTORY CLEAR I RESET PATH TO CLOSURE PLAN <br /> IMPEDIMENT 1: <br /> �enerel Criteria D:Free product has NOT been removed to the maximum extent practicable Procedural Impediment-LNFo <br /> Insufficient Data(Not ESI Compliant) <br /> DATE RESOLVED <br /> Step to Resolve Impedi mem 1-Step 1:- P - - <br /> 'rromot and effective protluct removal COMPLETION DATE <br /> PROJECTED DATE ACTUAL DATE <br /> 9/30/2014 <br /> ADD ADDITIONAL STEP <br /> IMPEDIMENT 2: <br /> General Criteria F:Secondary source has NOT been removed to the extent practicable r Procedural Impediment-AF <br /> o <br /> Step to Resolve Impediment 2-Stop 1:-DELETE STEP <br /> COMPLETION DATE <br /> Complete free product removal effort <br /> DATE ACTUAL DA <br /> 9/30/'1014 F— - <br /> ADD ADDITIONAL STEP <br /> IMPEDIMENT 3: <br /> Media-Specific Criteria:Groundwater.The contaminant plume that exceeds water quality objectives Is F Procedural Impediment-INFO <br /> NOT stable or decreasing in areal extent,and does NOT meet all of the additional characteristics of one of RP Appears Recalcitrant <br /> the five classes of sites. <br /> _ DATE RESOLVED <br /> Conditions that do not meet the policy criteria: 12/302013 <br /> • Plume Length(That Exceeds Water Quality Objectives):>-100 Feet and<250 Feet <br /> • Free Product in Groundwater:Yes <br /> • Free Product Has Been Removed to the Maximum Extent Practicable:No <br /> • For sites with free product,owner Willing to Accept a Land Use Restriction(if required):Unknown <br /> • Nearest Supply Well(From Plume Boundary):>260 Feet and 5 1,000 Feet <br /> to Resolve Impediment 3-Step 1:- <br /> llieldloti— to resolve the issue that the local agency has not received any reports for collecting free COMPLETION DATE <br /> product from monitoring well MW-2 or groundwater analysis for the year 2013. PROJECTED DATE ACTUALDATE <br /> 12/30/2013 1 <br /> Step to Resolve Impediment 3-Step 2:-DELETE STEP <br /> Complete free product removal. i COMPLETION DATE <br /> PROJECTED DATE ACTUAL DATE <br /> W30/2014 �— <br /> ADD ADDITIONAL STEP <br /> REQUIREMENTS ALONG PATH TO CLOSURE <br /> DATE IDENTIFIED RP NOTIFICATION PUBLIC PARTICIPATION WELL DESTRUCTION WASTE DISPOSAL LAND USE <br /> FOR CLOSURE CL SURE INITIATED BY DATE COMPLETION DATE DATE DATE RESTRICTION DATE SITE CLOSUREDA <br /> ( <br /> TE <br /> Save in Progress Save as Final <br /> LOGGED IN AS MCCARTNEY CONTACT GEOTRACKER HELP <br /> https:Hgeotracker.waterboards.ca.gov/regulators/screens/closure_policy.asp?global_id=T... 10/30/2013 <br />