Laserfiche WebLink
Page 2 of 2 <br /> data needed to perform the Monitored Natural Attenuation analysis. The slug test is currently schedule <br /> to occur in early December. After the slug test and free product monitoring is complete, we will issue a <br /> report summarizing the findings of this work as well as the well installation work. <br /> As far as the preparation of a work plan to perform batch extraction of groundwater at MW-4, we want to <br /> evaluate the most recent groundwater analytical data from September 2011 first. Based on the February <br /> 2011 data, there was a significant order of magnitude reduction in both TPH-Gasoline and benzene in <br /> groundwater samples from MW-4. Should this trend continue, groundwater extraction may not be <br /> warranted. <br /> Please contact us if you have any questions. <br /> Joseph Krohn, PG <br /> Taber Consultants <br /> 707 365 5843 <br /> jkrohn@taberconsultants.com <br /> 1 1/14/201 1 <br />