My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE FILE 2
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
3105
>
2900 - Site Mitigation Program
>
PR0542208
>
SITE INFORMATION AND CORRESPONDENCE FILE 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/24/2019 4:43:05 PM
Creation date
7/24/2019 4:34:41 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
FileName_PostFix
FILE 2
RECORD_ID
PR0542208
PE
2960
FACILITY_ID
FA0024243
FACILITY_NAME
CALIFORNIA TANK LINES
STREET_NUMBER
3105
Direction
S
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95206
APN
17512028
CURRENT_STATUS
01
SITE_LOCATION
3105 S EL DORADO ST
P_LOCATION
01
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
250
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 3 of 5 <br /> I noticed that the CAP/FS was posted on Geotracker on June 15, 2011. Per your comments <br /> below, a revised report was prepared that included the February 2011 monitoring data and <br /> included updated figures and tables. At this point, do you still want the report resubmitted <br /> on Geotracker? <br /> Joseph Krohn, PG <br /> Taber Consultants <br /> 707 365 5843 <br /> jkrohn@taberconsultants.com <br /> From: Vicki McCartney [EH] [mailto_vmccartney@sjcehd.com] <br /> Sent: Wednesday, June 29, 2011 1:24 PM <br /> To: Joseph Krohn <br /> Subject: RE: 3105 E EI Dorado - California Tank Lines <br /> Joseph, <br /> I'm sorry to hear about Tom Ballard. Please send my best wishes to him. <br /> Since I don't have the laboratory raw data report, I can not confirm the results for <br /> groundwater samples collected in February 2011 from MW-1 through MW-4. In addition to <br /> Table 5, Table 1 will also have to be revised as well as Figures 9 and 10, the TPH-D <br /> and TPH-MO results for MW-4 should be NA instead of ND: and Figure 12, the 1,2-DCA <br /> result for MW-4 should be <1 instead of 122 ug/L. <br /> I will be on vacation from July 1 st through July 10th, returning to the office on July 11 th and <br /> will follow up on everything upon my return. <br /> Thank you, Joseph. <br /> Vicki McCartney, Senior REHS <br /> San Joaquin County <br /> Environmental Health Department <br /> 600 East Main Street <br /> Stockton,California 95202 <br /> Phone: (209)468-9852 <br /> Fax: (209)468-3433 <br /> Email: vmccartneysri!sjcehd.com <br /> From: Joseph Krohn [ma ilto:IKrohn @taberconsulta_n_ts.coml <br /> Sent: Wednesday, June 29, 2011 10:59 AM <br /> To: Vicki McCartney [EH] <br /> Subject: RE: 3105 E EI Dorado - California Tank Lines <br /> The data used for contouring was based on the most recent sampling conducted in <br /> February 2011. Data table is attached. We are going to need to revise Table 5 of the <br /> CAPFS to reflect the correct dates. <br /> By the way, I wanted to give you an update and let you know that Tom Ballard has <br /> been in and out of the hospital for the past 3-4 weeks. We expect him to make a <br /> recovery soon. I am aware that the quarterly monitoring report needs to be <br /> submitted and will speak with Tom. <br /> I am meeting with Tom at his house today and hope to get a better status. <br /> 8/25/2011 <br />
The URL can be used to link to this page
Your browser does not support the video tag.