My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE FILE 2
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
3105
>
2900 - Site Mitigation Program
>
PR0542208
>
SITE INFORMATION AND CORRESPONDENCE FILE 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/24/2019 4:43:05 PM
Creation date
7/24/2019 4:34:41 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
FileName_PostFix
FILE 2
RECORD_ID
PR0542208
PE
2960
FACILITY_ID
FA0024243
FACILITY_NAME
CALIFORNIA TANK LINES
STREET_NUMBER
3105
Direction
S
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95206
APN
17512028
CURRENT_STATUS
01
SITE_LOCATION
3105 S EL DORADO ST
P_LOCATION
01
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
250
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Pagel of 2 <br /> Vicki McCartney [EH] <br /> From: Vicki McCartney [EH] <br /> Sent: Wednesday, May 19, 2010 4:09 PM <br /> To: 'Tom Ballard' <br /> Cc: Nuel Henderson [EH] <br /> Subject: RE: California Tank Line site <br /> Tom, <br /> I don't see anything mentioned in your email about defining the lateral extent of the groundwater plume around <br /> MW-4. This must be addressed in the work plan. <br /> I will be on vacation beginning May 24th. You may contact Nuel Henderson, if necessary, while I am away. <br /> Nuel's number is 209.468.3436. <br /> Vicki McCartney, Senior REHS <br /> San Joaquin County <br /> Environmental Health Department <br /> 600 East Main Street <br /> Stockton,California 95202 <br /> Phone: (209)468-9852 <br /> Fax: (209)468-3433 <br /> Email: vmccartnevld!sicehd.com <br /> From: Tom Ballard [mailto:TBaIla rd@taberconsultants.com] <br /> Sent: Wednesday, May 19, 2010 2:47 PM <br /> To: Vicki McCartney [EH] <br /> Cc: Martin Wills <br /> Subject: RE: California Tank Line site <br /> Vicki.- <br /> Sorry <br /> icki:Sorry for the delay, but here is the update: <br /> 1.) Sensitive Receptor Survey —we are in the field today following up on and confirming some well <br /> locations. The report is pretty much done so I anticipate having that to you by the end of the week <br /> or early next week. <br /> 2.) Report Revisions—we had some challenges with all the historical soil sampling data, but I think we <br /> have all that handled now. The revised reports are in final review and should be uploaded to <br /> Geotracker by the beginning of next week. <br /> 3.) Work Plan — Guy Roy is doing the bulk of the work on this and he should have the draft to me for <br /> my review by the end of the week, hopefully. The work plan will include information on installing <br /> the adsorbent material in MW-2 and will address the update to the Human Health Risk <br /> Assessment using the new DTSC petroleum hydrocarbon fractionation guidelines and the Natural <br /> Attenuation Assessment to address the area around MW-4. Also, there is some question on <br /> whether MW-1 is actually silted in, as had been discussed in our meeting, and that will be <br /> addressed in the work plan, as well. <br /> believe that addresses everything, but if I have missed anything, please let me know. <br /> Thomas E. Ballard <br /> Taber Consultants <br /> 5/19/2010 <br />
The URL can be used to link to this page
Your browser does not support the video tag.