My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0009310
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
3105
>
2900 - Site Mitigation Program
>
PR0542208
>
ARCHIVED REPORTS XR0009310
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/24/2019 4:55:39 PM
Creation date
7/24/2019 4:41:36 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0009310
RECORD_ID
PR0542208
PE
2960
FACILITY_ID
FA0024243
FACILITY_NAME
CALIFORNIA TANK LINES
STREET_NUMBER
3105
Direction
S
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95206
APN
17512028
CURRENT_STATUS
01
SITE_LOCATION
3105 S EL DORADO ST
P_LOCATION
01
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br /> • QUARTERLY MONITORING <br /> I REPORT <br /> I <br /> 10 INTRODUCTION <br /> The following is a chronological listing of activities at the California Tank Lines (CTL) Stockton <br /> Iterminal relevant to removal of underground storage tanks (USTs) and determination of the <br /> vertical and lateral extent of contamination <br /> IACTIVITY DATE BY <br /> Remove Waste Oil USTs 1990 Bill Messick Co <br /> Determine Extent of Contamination i 1997 Sierra-Pacific (SP) <br /> Remove Diesel USTs 1998 Station Equip Co <br /> Detennine Extent of Contamination 1999 Environeering, Inc (EI) <br /> Determine Extent of Contamination' 2000 Environeering, Inc (EI) <br /> I Quarterly Monitoring Report4 2000 Environeering, Inc (EI) <br /> Quarterly Monitoring Reports 2000 Environeering, Inc (EI) <br /> Quarterly Monitoring Report6 2001 Environeering, Inc (EI) <br /> I Quarterly Monitoring Report? 2001 Environeering, Inc (EI) <br /> Quarterly Monitoring Reports 2001 Environeering, Inc (EI) <br /> Quarterly Monitoring Report 2001 Environeering, Inc (EI) <br /> I Quarterly Monitoring Report 10 2002 Environeering, Inc (EI) <br /> Quarterly Monitoring Report" 2002 Environeering, Inc (EI) <br /> Quarterly Monitoring Report 12 2002 Environeering, Inc (EI) <br /> IQuarterly Monitoring Report13 2002 Environeenng, Inc (EI) <br /> Reference— Work Plan Dated 08/28/1996 <br /> Report of Investigation Dated 02/04/1997 <br /> 2 Reference-- Work Plan Dated 01/28/1999 <br /> IReport of Investigation Dated 02/03/2000 <br /> 'Reference— Work Plan Dated 05/01/2000 <br /> Work Plan Addendum Dated 05/11/2000 <br /> Report of Investigation Dated 01/23/2001 <br /> 4 Reference— Quarterly Monitoring Report Dated 05/15/2000 <br /> I 'Reference— Quarterly Monitoring Report Dated 08/31/2000 <br /> i <br /> I <br /> Enwroneenng,Inc Project No 03 00218 Page 1 <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.