Laserfiche WebLink
1 <br /> 1 <br /> QUARTERLY MONITORING <br /> 1 <br /> REPORT <br /> 1 <br /> 1 9.0 INTRODUCTION <br /> The following is a chronological listing of activities at the California Tank Lines (CTL) Stockton <br /> 1 terminal relevant to removal of underground storage tanks (USTs) and determination of the <br /> vertical and lateral extent of contamination <br /> 1 <br /> ACTIVITY DATE BY <br /> tRemove Waste Oil USTs 1990 Bill Messick Co <br /> Determine Extent of Contamination ; 1997 Sierra-Pacific (SP) <br />' Remove Diesel USTs 1998 Station Equip Co <br /> Determine Extent of Contamination 3 1999 Environeering, Inc (EI) <br /> Determine Extent of Contamination2000 Environeering, Inc (EI) <br /> Ile Quarterly Monitoring Report4 2000 Environeering, Inc (EI) <br /> Quarterly Monitoring Reports 2000 Environeering, Inc (EI) <br /> Quarterly Monitoring Report6 2001 Environeering, Inc (EI) <br />' Quarterly Monitoring Report' 2001 Environeering, Inc (EI) <br /> Quarterly Monitoring Reports 2001 Environeering,Inc (EI) <br /> Quarterly Monitoring Report9 2001 Environeering,Inc (EI) <br />' Quarterly Monitoring Report]° 2002 Environeering, Inc (EI) <br /> Quarterly Monitoring Report" 2002 Environeering, Inc (EI) <br />' i Reference— Work Plan Dated 08/28/1996 <br /> Report of Investigation Dated 02/04/1997 <br /> 2 Reference— Work Plan Dated 01/2$11999 <br /> Report of Investigation Dated 02/03/2000 <br /> 3 Reference— Work Plan Dated 05/01/2000 <br /> Work Plan Addendum Dated 05/11/2000 <br /> Report of Investigation Dated 01/23/2001 <br /> 4 Reference— Quarterly Monitoring Report Dated 05/15/2000 <br /> S Reference— Quarterly Monitoring Report Dated 08/31/2000 <br /> 6 Reference— Quarterly Monitoring Report Dated 01/29/2001 Q4, 2000 <br /> • <br /> Environeenng,Inc Project No 02.00716 page 1 <br />